4
1.
It must be noted that the system will require supplementary disinfection of
the distribution system if any water is used during a by-pass condition. In
addition, during by-pass, the water will NOT be disinfected and the attached
“DO NOT CONSUME THE WATER”
tag (included with the system), should
be physically installed on the by-pass assembly until such time as the
system is sanitized and returned to service. Please refer to the complete
disinfection procedure as outlined on page 6 of this document. If the water
is to be consumed while the system is off-line, the water must be boiled for
twenty minutes prior to consumption.
2.
Select a suitable location for the disinfection system and its related
components. As it is recommended to install a ground fault protected
circuit (GFCI), make sure that this is taken
into consideration prior to any installation.
The system can either be installed vertically
(inlet port at the bottom) (Figure 1A), or
horizontally, however the vertical installation
is the most preferred method. When
selecting a mounting location, you must also
leave enough space to allow for the removal
of the UV lamp and/or quartz sleeve (typically
leave a space equal to the size of the reactor
chamber itself).
3.
Mount the system to the wall using the
supplied clamps. Various connection
methods can be used to connect the water
source to the system. DO NOT SOLDER
CONNECTIONS WHILE ATTACHED TO THE
SYSTEM AS THIS COULD DAMAGE THE
O-RING SEALS.DAMAGE THE O-RING SEALS.
18
12