background image

CENTRA-R 60/120 - US

 

Quick Start Manual

Summary of Contents for CENTRA-R120-US

Page 1: ...CENTRA R 60 120 US Quick Start Manual ...

Page 2: ......

Page 3: ...on reproduction and use apply to all media in which this information may be placed VWS UK Ltd pursue a policy of continual product improvement and reserve the right to alter without notice the specification design price or conditions of supply of any product or service ELGA LabWater is a trading name of VWS UK Ltd ELGA is the global laboratory water brand name of Veolia Water ELGA PURELAB MEDICA a...

Page 4: ...OSHH 3 2 INSTALLATION 4 2 1 Unpacking CENTRA R 60 120 US 4 2 2 External services and connections 4 2 3 Connecting CENTRA R 60 120 US 5 3 COMMISSIONING 6 4 CONSUMABLE INSTALLATION 7 4 1 Protek L1 or L2 Pre treatment cartridge 7 4 2 By pass block 8 4 3 System purge 8 5 COMMISSIONING SANITIZATION 9 5 1 Liquid Sanitization 9 5 1 1 RO Sanitization 9 5 1 2 Recirculation Sanitization 12 5 2 Tablet Saniti...

Page 5: ...pment and processes 1 4 Electricity WARNING THIS APPLIANCE MUST BE EARTHED It is essential that the electrical supply to the CENTRA R 60 120 is isolated before any items are changed or maintenance work performed The external isolator providing power to the unit should be positioned so that it is easily accessible 1 5 Pressure The water supply should be isolated and residual pressure released prior...

Page 6: ...taken into consideration Water Supply Local potable supply with a means of isolation 2 2 External services and connections Connection Termination Specification Unit of Measure Metric US Imperial Feed water inlet BSP female thread Flow 9 l min 2 4 USG min Pressure 2 to 6 bar 30 to 88 psi Temperature 4 to 40 C 39 2 to 104 F Pressurised drain RO BSP female thread Maximum flow 10 l min 2 7 USG min Max...

Page 7: ...ccess to the sanitization port Drain hose connection 2 CONNECT drain to local drain with tube supplied Notes Ensure air gap is maintained from outlet of tube into a standpipe or surface drain The drains can be extended to a maximum length of 5 metres from the product using 15 mm PEXs rigid pipe It is strongly recommended that the hoses are secured to ensure they are always directed into the drain ...

Page 8: ...tting clock time Step 2 Clock 1 PRESS flashing CLOCK clock icon 2 PRESS to edit time OR PRESS to proceed to Step 3 3 PRESS and HOLD to increase or to decrease hour 4 PRESS to shift cursor onto minute 5 PRESS to increase or to decrease minutes 6 PRESS 7 PRESS Set date screens Step 3 Date 1 PRESS to edit date OR PRESS to proceed 2 PRESS and HOLD to increase or to decrease day 3 PRESS to shift cursor...

Page 9: ...se retaining arm 3 5 SWING retaining arm 3 fully open 6 REMOVE sealing blanks on connector manifold Installation of Protek cartridge Protek L1 or L2 acceptance screen 7 REMOVE Protek pre treatment cartridge LC175 LC177 from packaging 8 REMOVE sealing plugs from inlet and outlet ports 9 WET O rings located inside the ports 10 ALIGN Protek cartridge 4 on guide rails and SLIDE into place until it is ...

Page 10: ...ther water purity an additional stage of purification can be added in the form of a purification cartridge Labpure L1 and a Micro Filter See Operator Manual for installation instructions or refer to Technical Support 1 Wait for to be displayed 2 PRESS 4 3 System purge 1 PRESS the system now enters an automatic purge phase After a maximum of 60 minutes the system will exit the purge phase regardles...

Page 11: ...S FOLLOW RECOMMENDATIONS FOUND IN THE MANUFACTURERS MATERIAL SAFETY DATA SHEET AND ANY APPLICABLE OSHA STANDARDS FOR THE CHEMICAL BEING USED WARNING LABEL THE MACHINE WITH APPROPRIATE WARNING SIGNS SUCH AS DO NOT USE CONTAINS STERILANT NOT PROVIDED Minncare Cold Sterilant is a Peracetic and Hydrogen Peroxide based solution Refer to the Minncare label for additional information and follow all appli...

Page 12: ...tization 4 PRESS to enter RO sanitization Large white lid removal 5 UNSCREW lid on the left of the unit 6 MEASURE out 50ml of Minncare Cold Sterilant and SLOWLY POUR into the break tank 7 REPLACE lid Confirmation the chemical is added 8 PRESENT GREEN sanitization key to confirm that the chemical has been added ...

Page 13: ... 9 The system now enters a period of automatic sanitization lasting approximately 1 hour Once the step within the sanitization is complete the unit will stop and show date re set Set sanitization reminder 10 PRESS to accept the sanitization reminder the unit will go into process and continue to fill the recirculation reservoir ...

Page 14: ...Sanitization 1 ISOLATE application and ensure the process is OFF 2 PRESENT GREEN sanitization key to reader Sanitization selection screen 3 PRESS to enter sanitization process Enter RO sanitization 4 PRESS to show recirculation sanitization icon 5 PRESS sanitization to select recirculation Present the sanitization key ...

Page 15: ...ESS to allow the system to empty fill the reservoir The system will stop when the level reaches approximately 10 liters Small white lid removal 8 UNSCREW lid on the right of the unit 9 MEASURE out 250ml of Minncare Cold Sterilant and SLOWLY POUR into the main reservoir 10 REPLACE lid Confirmation the chemical is added 11 PRESENT GREEN sanitization key to confirm that the chemical has been added ...

Page 16: ... the unit will go straight into process and continue to fill the recirculation reservoir Set sanitization reminder 13 REFIT Labpure L1 LC187 14 PRESS to accept the sanitization reminder The system is now commissioned and ready for operation Note The automated rinse cycles are designed to remove the chemical sanitant from the system but for critical applications a water test is advised prior to use...

Page 17: ...MENDATIONS FOUND IN THE MANUFACTURERS MATERIAL SAFETY DATA SHEET AND ANY APPLICABLE OSHA STANDARDS FOR THE CHEMICAL BEING USED WARNING LABEL THE MACHINE WITH APPROPRIATE WARNING SIGNS SUCH AS DO NOT USE CONTAINS STERILANT NOT PROVIDED Refer to the EfferSan label for additional information and follow all applicable directions for use on the manufacturer s label in conjunction with the following ins...

Page 18: ... Tablet cutter for cutting EfferSan tablets 4 PRESS to enter RO sanitization CAUTION ENSURE THE CORRECT DOSAGE OF CHEMICAL IS USED Large white lid removal 5 UNSCREW lid on the left of the unit 6 CUT one EfferSan tablet into four quarters using tablet cutter 7 INSERT of EfferSan tablet into the break tank 8 REPLACE lid ...

Page 19: ...e chemical has been added RO sanitization process steps 10 The system now enters a period of automatic sanitization lasting approximately 1 hour Once the step within the sanitization is complete the unit will stop and show date re set Set sanitization reminder 11 PRESS to accept the sanitization reminder the unit will go into process and continue to fill the recirculation reservoir ...

Page 20: ...Sanitization 1 ISOLATE application and ensure the process is OFF 2 PRESENT GREEN sanitization key to reader Sanitization selection screen 3 PRESS to enter sanitization process Enter RO sanitization 4 PRESS to show recirculation sanitization icon 5 PRESS sanitization to select recirculation Present the sanitization key ...

Page 21: ...rvoir The system will stop when the level reaches approximately 10 liters CAUTION ENSURE THE CORRECT DOSAGE OF CHEMICAL IS USED Small white lid removal 8 UNSCREW small lid on the right of the unit 9 CUT one EfferSan tablet into two halves using tablet cutter 10 INSERT Half of an EffenSan tablet into the break tank 11 REPLACE lid Confirmation the chemical is added 12 PRESENT GREEN sanitization key ...

Page 22: ... the unit will go straight into process and continue to fill the recirculation reservoir Set sanitization reminder 14 REFIT Labpure L1 LC187 15 PRESS to accept the sanitization reminder The system is now commissioned and ready for operation Note The automated rinse cycles are designed to remove the chemical sanitant from the system but for critical applications a water test is advised prior to use...

Page 23: ...wing modes of operation Night service Operational day Continuous Recirculation 24 7 Sanitization Procedure CENTRA R 60 120 US is supplied set up to operate on Monday to Friday between the hours of 07 30 to 18 00 Refer to Operator Manual supplied on CD for instructions on how to adjust the times of operation or to switch to continuous recirculation ...

Page 24: ...S ELGA LabWater Lane End Industrial Park High Wycombe Bucks HP14 3BY UK Tel 44 0 203 567 7300 Fax 44 0 203 567 7205 E mail techsupport elgalabwater com For the address of your nearest ELGA LabWater Sales and Service office visit the country list on our website http www elgalabwater com or contact ELGA at the number above ...

Reviews: