USA and Canada 800.683.2378, International 904.641.1666
9
SIZING IN GALLONS
Pre-Programming Requirements
continued
C.
Calculate
Metering Pump Output Requirement in Gallons per Day.
Maximum System Flow Rate (gpm) x Dosage (ppm) x 1440
=
Metering Pump
Output Requirement
Solution Strength ppm
*
(gpd)
*
Solution Strength % x 10,000 = Solution Strength ppm
D.
Reference the chart below to confirm the selected pump’s maximum output slightly
exceeds the pump output requirement calculated in C.
Stenner Fixed Output Pumps (26-100 psi)
Model
Pump Tube
Maximum Output (gpd)
45MPHP2
#1
3
45MPHP10
#2
10
45MPHP22
#7
22
85MPHP5
#1
5
85MPHP17
#2
17
85MPHP40
#7
40