STEIN300_Umsetzer_04_GB.doc / 03.2020
9
2.4
Initial inspection
The transfer unit is bubble-wrapped and securely transported in a solid box. Alternatively,
the transfer unit can be pre-assembled in the conveyor
.
Unpack all the components supplied.
Environmental protection
Dispose of all packaging material in an environmentally responsible way.
Then carry out an initial inspection
.
Check that
:
the delivery is complete in accordance with the enclosed delivery note
components have not been damaged or lost in transit.
2.5
Complaints
In order for claims for damages caused in transit to be accepted, follow this procedure
:
Inform the freight company.
Draw up a damage report giving the following details
•
Name and address of recipient
•
Item or order number
•
A description of the damage.
Send components, if possible in their original packaging, with the damage report,
back to the manufacturer.
2.6
Warranty
We guarantee the transfer unit and its spare parts for a warranty term as prescribed by
law or for the warranty period set out in the supply agreement commencing from the
date of delivery.
During this warranty period we will replace any components defective in manufacture or
materials free of charge.
STEIN Automation's general warranty conditions also apply
.