Starter ARKANE Operating And Maintenance Manual Download Page 35

 

 
 

 
 

- 34 - 

 MU0091.B 

 

 

10.4  Corrective maintenance 

10.4 

Maintenance corrective 

 
 
 
EN 

Problem

 

Possible cause

 

Corrective action

 

Winch  won’t  operate  in 
either  direction  or  motor 
doesn’t operate 

Power 

is 

not 

connected 

-or- 

Emergency  on/off 
switch  is  in  “off” 
position 

A)  Check  wiring  connections.  Check  for  12  at 
positive  (+)  terminal  on  controller.  Check  for 
voltage  at  blue  and  yellow  terminals  with  remote 
switch in either direction.  
B) Check position of emergency on/off switch. 

Power  to  remote 
pendant has been 
interrupted 

Check  for  12v  at  center  pin  of  remote  socket  on 
controller.  Check  continuity  of  remote  lead 
connector  from  center  pin  to  either  side  pin  with 
remote  control  pendant  on/off  switch  in  both 
positions.  Replace  remote  control  pendant  if there 
is no continuity. 

Winch will power out but not 
power-in 

Failure  in  remote 
control 

pendant 

switch or wiring 

Check  for  12v  at  center  pin  of  remote  socket  on 
controller.  Check  continuity  of  remote  lead 
connector  from  center  pin  to  either  side  pin  with 
remote  control  pendant  on/off  switch  pushed  in 
both  positions.  Replace  remote  control  pendant  if 
there is no continuity.  

Failure of 
components or 
wiring inside 
controller 

Check  for  12v  at  center  pin  of  remote  socket  on 
controller.  Check  continuity  of  remote  lead 
connector  from  center  pin  to  either  side  pin  with 
remote  control  pendant  on/off  switch  in  both 
positions.  Replace  remote  control  pendant  if there 
is no continuity. If none of these corrective actions 
resolves problem, return the trolley to Starter. 

Winch  will  power-in  but  not 
power-out 

Power to remote 
control pendant 
has been 
interrupted 

Check  for  12v  at  center  pin  of  remote  socket  on 
controller.  Check  continuity  of  remote  lead 
connector  from  center  pin  to  either  side  pin  with 
remote  control  pendant  on/off  switch  pushed  in 
both  positions.  Replace  remote  control  pendant  if 
there is no continuity 

Motor  tries  to  power-out  but 
winch stalls or locks-up 

Load brake failure  Service or replace load brake. 

Winch  operates  in  both 
directions  but  will  not  lift 
rated load 

Low  voltage  at 
winch 

A) Check condition of battery. 
B)  Check  all  power  wiring  and  connections  for 
corrosion. Clean and tighten connections 

Winch  slows  down  and 
stalls during power out 

Brake needs 
service 

Service or replace load brake. 

Winch  vibrates  badly  or  is 
noisy during use under load 

Brake needs 
servicing 

Service or replace load brake. 

 

Summary of Contents for ARKANE

Page 1: ...ence Chaque op rateur doit le lire et le comprendre T l 33 01 39 09 27 66 Maintenance Repair Original replacements parts Service contracts Technical and safety survey Maintenance et Entretien R parati...

Page 2: ...ation 20 5 GENERAL USE INSTRUCTION 23 6 LOAD LIMITER AND LIMIT SWITCHES 25 6 1 Load limiter 25 6 2 Limit switches 25 7 VISUAL MOTOR WARM UP INDICATOR 27 8 SPECIAL INSTRUCTION ABOUT ROPE USE 28 9 ROPE...

Page 3: ...TION GENERALES 23 6 LIMITATION DE CHARGE ET FIN DE COURSES 25 6 1 Limitation de charge 25 6 2 Fin de courses 25 7 INDICATEUR VISUEL D ECHAUFFEMENT MOTEUR 27 8 CONSIGNES PARTICULIERE RELATIVES A L UTIL...

Page 4: ...al requests please contact our sales department Merci d avoir achet une potence ARKANE le made in France by STARTER Cette nouvelle gamme de potences con ue et fabriqu e dans nos usines SAINT OUEN L AU...

Page 5: ...BILITY ONLY AUTHORIZED DEALERS AND QUALIFIED MECHANICS MAY ADJUST OR REPAIR THE PRODUCT AVANT TOUTE UTILISATION LE PERSONNEL EN CHARGE DE L INSTALLATION ET DE L UTILISATION DU MAT RIEL DOIT IMP RATIVE...

Page 6: ...must carry out the training necessary of the operators Operators must always work in conformity with this manual instructions Operators must always start loads lifting with the lowest speed of liftin...

Page 7: ...rdance with the requirements of this manual Eviter le pianotage sur les organes de commande Il est interdit de lever des personnes L op rateur doit tre attentif la man uvre effectu e et avoir une visi...

Page 8: ...block a load during transport Enroulement du c ble sur le tambour Toujours respecter les tours morts sur le tambour Respecter la charge maximale de la potence Cf CMU indiqu e sur le chariot Ne pas st...

Page 9: ...e would damage the synthetic rope and affect its strength 2 2 Consignes de s curit particuli res propres au c ble Ne jamais toucher le c ble synth tique ou acier lorsqu il est sous charge Le port de g...

Page 10: ...h 2 Quick sockets for electric versions Les potences ARKANE se composent de D un pied en tube acier rond D un bras pivotant en tube acier rectangulaire D un chariot de translation quip d un guide c bl...

Page 11: ...ngueur de c ble disponible synth tique ou acier Energy Alimentation Weight Masse totale kg ARKANE 250 MA GRU00350 250 1 5m Manuelle Manual 50 ARKANE 250 EL GRU00345 250 4m ou 10m 4m ou 10m 12V 67 ARKA...

Page 12: ...11 MU0091 B...

Page 13: ...t fix e la potence doit tre correctement dimensionn e et r alis e Les sollicitations prendre en compte dans les calculs sont les suivantes ARKANE 250 ARKANE 500 Low fixing point Point de fixation bas...

Page 14: ...ts For the Upper fixing point of the crane you have in the kit two collars and a fixation support that will have to attach to a rigid point of the vehicle able to resist to the efforts described in Ch...

Page 15: ...14 MU0091 B...

Page 16: ...upe circuit 1 40A fuse and its support 1 fusible 40A et son porte fusible 1 quick socket 2x 35mm pods for battery connection and its fixation bolts 1 prise quick 2 cosses 35mm pour la liaison batterie...

Page 17: ...of your crane can be carried out on our workshop in this case please contact our sales department Pour le raccordement lectrique veuillez respecter le sch ma ci dessous la pose compl te de votre poten...

Page 18: ...send the trolley to after sales service 4 6 Test statique Le c ble de travail est livr s par ment et ne doit pas servir lors du test r glementaire Un c ble d essai de m me nature que votre c ble de tr...

Page 19: ...y a pas de d formation plastique et notamment aux niveaux des points de fixation sur le v hicule 9 Enlever le poids de surcharge et reposer la charge 10 Enlever le c ble de test et installer le c ble...

Page 20: ...19 MU0091 B...

Page 21: ...roper winding the rope can be damaged on sharp edges and break 4 7 Fixation du c ble Le maintien du c ble sur le tambour se fait en partie par l adh rence entre le c ble et le tambour Dans le cas d un...

Page 22: ...limit switches 1 Pass the rope through the rubber stop until you come into contact with the hook Avant d enrouler le c ble il est imp ratif d installer la but e caoutchouc livr e avec la potence Cell...

Page 23: ...pe leaving space to insert the ball If you have lost the ball you can replace it with an M4 nut Insert the ball into the loop and pull the cable until the ball disappears 4 5 Resserrer la boucle en ti...

Page 24: ...Y RESPECT the maximum load of your ARKANE crane 5 CONSIGNES D UTILISATION GENERALES Les freins du v hicule doivent tre serr s Utiliser la b quille en option Des pr cautions suppl mentaires doivent tre...

Page 25: ...control for electrical crane Votre potence ARKANE est maintenant pr te l emploi D ployer votre potence et brancher votre t l commande pour les versions lectriques Emergency stop Arr t d urgence UP mo...

Page 26: ...ed by a red marking color on the rope so it is visual and not mechanical This red marking guarantees the number of dead wraps on the drum It is imperative to always check the rope when your load is co...

Page 27: ...26 MU0091 B Higher limit switch Fin de course haut Lower Limit switch Fin de course bas STOP YES OUI YES OUI NO NON...

Page 28: ...nces lectriques ARKANE sont quip s d un adh sif thermosensible r versible coll sur la carcasse du moteur lectrique Cet adh sif est un indicateur visuel de l chauffement du moteur Apr s plusieurs utili...

Page 29: ...de travail est n cessaire pour une inspection visuelle visant d terminer si le c ble de votre potence peut continuer tre utilis ou doit tre chang Il est important que le c ble soit r guli rement inspe...

Page 30: ...s la zone affect e est raide et le c ble a un aspect glac Original rope dimension Encombrement original du c ble Rope decreasing 25 strand volume reduction from abrasion rope should be replaced C ble...

Page 31: ...ind the rope on the drum following the procedure R aliser sur l extr mit libre du c ble acier ou synth tique le marquage suivant les tapes ci apr s 1 Positionner un scotch en respectant la longueur L...

Page 32: ...grease every 6 months the articulation between the arm of the crane and the pillar Grease Type NLGI 2 or equivalent Grease nipple type Droit M8 10 1 Graissage Il est conseill de recharger en graisse...

Page 33: ...nce exempte de salet de graisse d eau et autres substances V rifier tous les boulons de montage et s assurer qu ils sont serr s aux couples recommand s de 79 3Nm Remplacer toute fixation endommag e Co...

Page 34: ...ool out and check rope Visual check of winch and control Brake test Load limiter test Activit de maintenance Apr s la premi re utilisation Avant chaque utilisation Apr s chaque utilisation Tous les se...

Page 35: ...ant if there is no continuity Failure of components or wiring inside controller Check for 12v at center pin of remote socket on controller Check continuity of remote lead connector from center pin to...

Page 36: ...du c blage l int rieur de la bo te relais V rifier qu il y a 12 V la broche centrale de la prise de t l commande de la bo te relais V rifier la continuit du connecteur du fil de t l commande entre la...

Page 37: ...essous entre 8h30 et 18h00 du lundi au jeudi et vendredi 16h pour assistance Pour recevoir une assistance technique ou par courrier lectronique STARTER SERVICES Groupe DLD Parc d activit du Vert Galan...

Page 38: ...9 ACTC0071 ARKANE 500 EL GRU00346 ACTC0400 ACTC0295 ACTC0060 ACTC0052 11 3 Wire rope Spare parts 11 3 Pi ces de rechange C bles 11 4 Crane Spare parts 11 4 Pi ces de rechange Potence For electrical cr...

Page 39: ...38 MU0091 B...

Page 40: ...39 MU0091 B...

Page 41: ...40 MU0091 B...

Page 42: ...41 MU0091 B...

Page 43: ...42 MU0091 B...

Page 44: ...suits your crane 11 5 Option Base potence Il est possible de raccourcir la hauteur de la potence pour l adapter votre v hicule Pour cela il faut couper le pied et faire une encoche comme indiqu ci des...

Page 45: ...44 MU0091 B 11 6 Declaration of conformity CE 11 6 D claration de conformit CE...

Page 46: ...45 MU0091 B NOTE...

Page 47: ...46 MU0091 B NOTE...

Page 48: ...EN L AUMONE FRANCE T l 33 0 1 39 09 19 19 Fax 33 0 1 39 09 27 57 e mail starter groupedld com Site internet http www groupedld com Maintenance Repair Original replacements parts Service contracts Tech...

Reviews: