Starter ARKANE Operating And Maintenance Manual Download Page 26

 

 
 

 
 

- 25 - 

 MU0091.B 

 

 
 

6 LOAD LIMITER AND LIMIT 
SWITCHES 

LIMITATION DE CHARGE ET 

FIN DE COURSES 

 

6.1  Load limiter 

The  electric  cranes  are  fitted  with  a  load 
limiter. 
This  device  allows  you  to  limit  the  maximum 
load in the first layer (see information on your 
crane).  
 

This  device  is  set  in  the  factory  and 
should not be modified.  

 
Any  change  lead  a  danger  for  which 
STARTER could not be held responsible. 

6.1 

 Limitation de charge  

Les  potences  électriques  sont  équipées 

d’un 

limiteur de charge. 
Ce dispositif permet de limiter la charge maxi 
en  1

ère

  couche  (voir  information  sur  votre 

potence).  
 

Ce  dispositif  est  réglé  en  usine  et  ne  doit 
pas être déréglé.  

 
Toute  modification  entraine  un  danger  dont 
STARTER ne pourrait être tenu responsable. 

 

6.2  Limit switches 

6.2 

 Fin de courses  

 

The  electric  cranes  are  fitted  with  a  high 
mechanical  limit  switch  (winding).  This 
function is performed by the same system as 
the load limitation, it is activated by the rubber 
stop  installed  on  the  rope  of  your  crane, 
coming into contact with the hawse fairlead. It 
is  therefore  imperative  to  have  this  rubber 
stop  on  your  rope.  Please  always  check  his 
presence.  
 
The  low  limit  switch  warning  (unrolling)  is 
performed by a red marking color on the rope, 
so  it  is  visual  and  not  mechanical.  This  red 
marking  guarantees  the  number  of  dead 
wraps on the drum. 
 
It  is  imperative  to  always  check  the  rope 
when  your  load  is  coming  down.  As  soon  as 
the red light appears, stop the process 
 
 
If you change length or change the  rope that 
doesn't  come  from  STARTER,  it's  imperative 
to  make  this  marking  on  your  new  rope. 
(Refer to the marking procedure chapter) 

Les  poten

ces  électriques  sont  équipées  d’un 

fin 

de 

course 

mécanique 

haut 

(à 

l’enroulement). Cette fonction est réalisée par 
le même système que la limitation de charge, 
elle  est  activée  par  la  butée  caoutchouc 
installée sur le câble de votre potence, venant 
en  cont

act  de  l’écubier.  Il  est  donc  impératif 

d’avoir  cette  butée  sur  votre  câble.  Veuillez 
toujours vérifier sa présence.  
 
L’avertissement  de  fin  de  course  bas  (en 
déroulement)  est  réalisée  par  un  marquage 
de  couleur  rouge  sur  le  câble,  elle  est  donc 
visuelle  et  non  mécanique.  Ce  marquage 
rouge garanti le nombre de tours morts sur le 
tambour. 
Il  est  donc  impératif  de  toujours  surveiller  le 
câble à la descente de votre charge. Dès que 
le 

témoin 

rouge 

apparait, 

arrêtez 

le 

déroulement 
 
En  cas  de  modification  de  longueur  ou  de 
changement de câble qui ne proviendrait pas 
de  chez  STARTER,  il est  impératif  de  refaire 
ce  marquage  sur  votre  nouveau  câble.  (Se 
référer au chapitre procédure de marquage) 

 

 

Summary of Contents for ARKANE

Page 1: ...ence Chaque op rateur doit le lire et le comprendre T l 33 01 39 09 27 66 Maintenance Repair Original replacements parts Service contracts Technical and safety survey Maintenance et Entretien R parati...

Page 2: ...ation 20 5 GENERAL USE INSTRUCTION 23 6 LOAD LIMITER AND LIMIT SWITCHES 25 6 1 Load limiter 25 6 2 Limit switches 25 7 VISUAL MOTOR WARM UP INDICATOR 27 8 SPECIAL INSTRUCTION ABOUT ROPE USE 28 9 ROPE...

Page 3: ...TION GENERALES 23 6 LIMITATION DE CHARGE ET FIN DE COURSES 25 6 1 Limitation de charge 25 6 2 Fin de courses 25 7 INDICATEUR VISUEL D ECHAUFFEMENT MOTEUR 27 8 CONSIGNES PARTICULIERE RELATIVES A L UTIL...

Page 4: ...al requests please contact our sales department Merci d avoir achet une potence ARKANE le made in France by STARTER Cette nouvelle gamme de potences con ue et fabriqu e dans nos usines SAINT OUEN L AU...

Page 5: ...BILITY ONLY AUTHORIZED DEALERS AND QUALIFIED MECHANICS MAY ADJUST OR REPAIR THE PRODUCT AVANT TOUTE UTILISATION LE PERSONNEL EN CHARGE DE L INSTALLATION ET DE L UTILISATION DU MAT RIEL DOIT IMP RATIVE...

Page 6: ...must carry out the training necessary of the operators Operators must always work in conformity with this manual instructions Operators must always start loads lifting with the lowest speed of liftin...

Page 7: ...rdance with the requirements of this manual Eviter le pianotage sur les organes de commande Il est interdit de lever des personnes L op rateur doit tre attentif la man uvre effectu e et avoir une visi...

Page 8: ...block a load during transport Enroulement du c ble sur le tambour Toujours respecter les tours morts sur le tambour Respecter la charge maximale de la potence Cf CMU indiqu e sur le chariot Ne pas st...

Page 9: ...e would damage the synthetic rope and affect its strength 2 2 Consignes de s curit particuli res propres au c ble Ne jamais toucher le c ble synth tique ou acier lorsqu il est sous charge Le port de g...

Page 10: ...h 2 Quick sockets for electric versions Les potences ARKANE se composent de D un pied en tube acier rond D un bras pivotant en tube acier rectangulaire D un chariot de translation quip d un guide c bl...

Page 11: ...ngueur de c ble disponible synth tique ou acier Energy Alimentation Weight Masse totale kg ARKANE 250 MA GRU00350 250 1 5m Manuelle Manual 50 ARKANE 250 EL GRU00345 250 4m ou 10m 4m ou 10m 12V 67 ARKA...

Page 12: ...11 MU0091 B...

Page 13: ...t fix e la potence doit tre correctement dimensionn e et r alis e Les sollicitations prendre en compte dans les calculs sont les suivantes ARKANE 250 ARKANE 500 Low fixing point Point de fixation bas...

Page 14: ...ts For the Upper fixing point of the crane you have in the kit two collars and a fixation support that will have to attach to a rigid point of the vehicle able to resist to the efforts described in Ch...

Page 15: ...14 MU0091 B...

Page 16: ...upe circuit 1 40A fuse and its support 1 fusible 40A et son porte fusible 1 quick socket 2x 35mm pods for battery connection and its fixation bolts 1 prise quick 2 cosses 35mm pour la liaison batterie...

Page 17: ...of your crane can be carried out on our workshop in this case please contact our sales department Pour le raccordement lectrique veuillez respecter le sch ma ci dessous la pose compl te de votre poten...

Page 18: ...send the trolley to after sales service 4 6 Test statique Le c ble de travail est livr s par ment et ne doit pas servir lors du test r glementaire Un c ble d essai de m me nature que votre c ble de tr...

Page 19: ...y a pas de d formation plastique et notamment aux niveaux des points de fixation sur le v hicule 9 Enlever le poids de surcharge et reposer la charge 10 Enlever le c ble de test et installer le c ble...

Page 20: ...19 MU0091 B...

Page 21: ...roper winding the rope can be damaged on sharp edges and break 4 7 Fixation du c ble Le maintien du c ble sur le tambour se fait en partie par l adh rence entre le c ble et le tambour Dans le cas d un...

Page 22: ...limit switches 1 Pass the rope through the rubber stop until you come into contact with the hook Avant d enrouler le c ble il est imp ratif d installer la but e caoutchouc livr e avec la potence Cell...

Page 23: ...pe leaving space to insert the ball If you have lost the ball you can replace it with an M4 nut Insert the ball into the loop and pull the cable until the ball disappears 4 5 Resserrer la boucle en ti...

Page 24: ...Y RESPECT the maximum load of your ARKANE crane 5 CONSIGNES D UTILISATION GENERALES Les freins du v hicule doivent tre serr s Utiliser la b quille en option Des pr cautions suppl mentaires doivent tre...

Page 25: ...control for electrical crane Votre potence ARKANE est maintenant pr te l emploi D ployer votre potence et brancher votre t l commande pour les versions lectriques Emergency stop Arr t d urgence UP mo...

Page 26: ...ed by a red marking color on the rope so it is visual and not mechanical This red marking guarantees the number of dead wraps on the drum It is imperative to always check the rope when your load is co...

Page 27: ...26 MU0091 B Higher limit switch Fin de course haut Lower Limit switch Fin de course bas STOP YES OUI YES OUI NO NON...

Page 28: ...nces lectriques ARKANE sont quip s d un adh sif thermosensible r versible coll sur la carcasse du moteur lectrique Cet adh sif est un indicateur visuel de l chauffement du moteur Apr s plusieurs utili...

Page 29: ...de travail est n cessaire pour une inspection visuelle visant d terminer si le c ble de votre potence peut continuer tre utilis ou doit tre chang Il est important que le c ble soit r guli rement inspe...

Page 30: ...s la zone affect e est raide et le c ble a un aspect glac Original rope dimension Encombrement original du c ble Rope decreasing 25 strand volume reduction from abrasion rope should be replaced C ble...

Page 31: ...ind the rope on the drum following the procedure R aliser sur l extr mit libre du c ble acier ou synth tique le marquage suivant les tapes ci apr s 1 Positionner un scotch en respectant la longueur L...

Page 32: ...grease every 6 months the articulation between the arm of the crane and the pillar Grease Type NLGI 2 or equivalent Grease nipple type Droit M8 10 1 Graissage Il est conseill de recharger en graisse...

Page 33: ...nce exempte de salet de graisse d eau et autres substances V rifier tous les boulons de montage et s assurer qu ils sont serr s aux couples recommand s de 79 3Nm Remplacer toute fixation endommag e Co...

Page 34: ...ool out and check rope Visual check of winch and control Brake test Load limiter test Activit de maintenance Apr s la premi re utilisation Avant chaque utilisation Apr s chaque utilisation Tous les se...

Page 35: ...ant if there is no continuity Failure of components or wiring inside controller Check for 12v at center pin of remote socket on controller Check continuity of remote lead connector from center pin to...

Page 36: ...du c blage l int rieur de la bo te relais V rifier qu il y a 12 V la broche centrale de la prise de t l commande de la bo te relais V rifier la continuit du connecteur du fil de t l commande entre la...

Page 37: ...essous entre 8h30 et 18h00 du lundi au jeudi et vendredi 16h pour assistance Pour recevoir une assistance technique ou par courrier lectronique STARTER SERVICES Groupe DLD Parc d activit du Vert Galan...

Page 38: ...9 ACTC0071 ARKANE 500 EL GRU00346 ACTC0400 ACTC0295 ACTC0060 ACTC0052 11 3 Wire rope Spare parts 11 3 Pi ces de rechange C bles 11 4 Crane Spare parts 11 4 Pi ces de rechange Potence For electrical cr...

Page 39: ...38 MU0091 B...

Page 40: ...39 MU0091 B...

Page 41: ...40 MU0091 B...

Page 42: ...41 MU0091 B...

Page 43: ...42 MU0091 B...

Page 44: ...suits your crane 11 5 Option Base potence Il est possible de raccourcir la hauteur de la potence pour l adapter votre v hicule Pour cela il faut couper le pied et faire une encoche comme indiqu ci des...

Page 45: ...44 MU0091 B 11 6 Declaration of conformity CE 11 6 D claration de conformit CE...

Page 46: ...45 MU0091 B NOTE...

Page 47: ...46 MU0091 B NOTE...

Page 48: ...EN L AUMONE FRANCE T l 33 0 1 39 09 19 19 Fax 33 0 1 39 09 27 57 e mail starter groupedld com Site internet http www groupedld com Maintenance Repair Original replacements parts Service contracts Tech...

Reviews: