Page 42
7.
Remove the spring pulleys every three months. Clean the spring
pulley shafts with a dry cloth. Protect the shafts from corrosion with a
thin coat of multi-purpose grease before reassembling.
8.
Remove the pedals every three months. Clean the pedal shaft and
leveling arm pin with a dry cloth. Protect the pedal shaft and leveling
arm pin from corrosion with a light coat of multi-purpose grease
before reassembling.
Battery Charge
If you have a 4600/4400 CL, remove the bottom cover and check the battery
voltage level every three months.
1.
Using your multimeter, touch the red lead to the positive
terminal of the battery and the black lead to the negative terminal.
2.
If the voltage level is less than 6.1 VDC, charge the battery. Plug
the wall pack battery charger into the connector located near the
bottom of the left bottom cover. Charge the battery for approximately
24 to 48 hours and then recheck it. It is okay to use the machine
while the battery charger is connected.
Battery Disposal
When ordering new batteries, you will need to properly dispose of (recycle)
your old lead-acid batteries. Most federal and state regulations require lead-
acid batteries to be recycled. Do not throw away old batteries. Lead is a toxic
heavy metal, hazardous to living organisms. Disposal instructions and a list of
recycling centers are tabulated in the Appendix. If you have questions, contact
the Customer Service Department at (800) 331-3578.
MAINTENANCE INSTRUCTIONS
!
WARNING
TO REDUCE THE POSSIBILITY OF SLIPPING, BE SURE THE PEDAL
AREA IS FREE OF GREASE OR OIL. WIPE ANY EXCESS OIL OFF
THE MACHINE SURFACES.
Summary of Contents for FREECLIMBER 4200 PT
Page 1: ...FREECLIMBER 4200 PT 4400 PT CL AND 4600 PT CL OWNER S MANUAL ...
Page 13: ...Page 4 Figure 2 Major Parts 4200 PT and 4400 PT CL INTRODUCTION ...
Page 83: ...Page 74 APPENDICES Figure 11 Parts Needing Periodic Maintenance ...
Page 84: ...Page 75 APPENDICES Figure 12 Final Assembly Left 4600 PT ...
Page 85: ...Page 76 APPENDICES Figure 13 Final Assembly Right 4600 PT ...
Page 86: ...Page 77 APPENDICES Figure 14 Final Assembly Left 4600 CL ...
Page 87: ...Page 78 APPENDICES Figure 15 Final Assembly Right 4600 CL ...
Page 88: ...Page 79 APPENDICES Figure 16 Covers 4600 PT CL ...
Page 91: ...Page 82 APPENDICES Figure 19 Final Assembly Left 4400 4200 PT ...
Page 92: ...Page 83 APPENDICES Figure 20 Final Assembly Right 4400 4200 PT ...
Page 93: ...Page 84 APPENDICES Figure 21 Final Assembly Left 4400 CL ...
Page 94: ...Page 85 APPENDICES Figure 22 Final Assembly Right 4400 CL ...
Page 95: ...Page 86 APPENDICES Figure 23 Covers 4400 PT CL 4200 PT ...
Page 96: ...Page 87 APPENDICES Figure 24 Cover Removal ...
Page 97: ...Page 88 Figure 25 Cover fasteners APPENDICES ...
Page 98: ...Page 89 APPENDICES Figure 26 Drive Chain tensioning ...