BAST_
02.FM
9
3 Installation
3.3 Installing trolley on chain hoist
1. US-G 10 with ST05
Always suspend chain hoist from centre of trolley. See
sketch, page 8
US-G 10 with ST10
Fit suspension piece with suspension bolt (a) to chain hoist. Note installation
position of suspension piece. Lock bolt (a) with washer (b) and cheese-head
screw (c). See
sketch
KFN 10/32 with ST10/ST20-ST32; ST50 /ST60 1/1
Fit suspension piece with suspension bolt (a) to chain hoist. Note installation
position of suspension piece. Lock bolt (a) with locking plate (b) and cheese-head
screw (c). See
sketch
2. Slide trolley onto runway or push on from below after swivelling the side cheeks
up.
3. Check that screws and nuts are tightened with specified torque, see page
12.
4. The screw retentions must be fitted!
US-G10 with ST05 1/1 ... 2/1
US-G10 with ST10 1/1
KFN10/32 1/1
KFN10/32 2/1
10.06