Ethernet CPU module and
power module for Zone 1/Class I, Div.1
Series 9441, Series 9444, Series 9492
6
Parameterization and Commissioning
Before commissioning, carry out the following checks:
• Mounting and installation of the device according to regulations.
• Correct, secure connection of the cables.
• No damage to the device or the cables.
• The screws are securely fastened to the terminals.
Correct tightening torque: 0.5 to 0.6 Nm.
Do not commission the device until it has been successfully tested.
6.1
Parameterizations
Parameterisation and commissioning of the CPU is performed using the IS1+ DeviceDTM.
The buttons of the LCD display in the socket can be used
• to display diagnostic data for the CPU module (both primary and backup CPU),
• to adjust the communication addresses for the CPU module
(both primary and backup CPU),
• to display information about the CPU module (both primary and backup CPU) and the
I/O modules installed on the BusRail.
Changes to the IP address and the Subnet mask can lead to communication loss via
Ethernet!
Changes to the communication addresses have an immediate effect on the system
behaviour and can lead to an error in the system!
Changes to the communication addresses must only be made by trained,
authorised service staff!