Page | 4
2. Installation and setup
NOTE:
Before installation, please inspect the unit. Be sure that nothing inside the package is damaged.
Please keep the original package in a safe place for future use.
2.1 120V Models Rear panel view
2.1.1 800VA/1.1KVA/1.5KVA
2.1.2 2 kVA
2.1.3 3 kVA
1. Programmable outlets: connect to non-critical loads.
2. Output receptacles: connect to mission-critical loads.
3. AC input
4. Network/Fax/Modem surge protection
5. Emergency power off function connector (EPO)
6. USB communication port
7. RS-232 communication port
8. SNMP intelligent slot
9. External battery connector
kVA
Input
Connection
Output
Connection
800VA/1.1KVA/1.5KVA
5-15P
5-15R
2kVA
5-20P
5-20R
3 kVA
L5-30P
5-20R & L5-30R
Table 1
– Input/Output Connections