background image

OPERATING MANUAL

 

MN-SST50 
ED-17-09 

 

 

SPRIANO® TECHNOLOGIES 

- www.spriano.it – [email protected]

 

a TERRANOVA® Srl brand

 - www.terranova-instruments.com - VAT IT07848810151 

Factory & Sales: Via Gramsci 1 – 26827 Terranova dei Passerini (LO) – Italy 
Head Office: Via Rosso Medardo 16 – 20159 Milano – Italy Ph: +39 0377 919119 – Fax: +39 0377 855720 

 

Pa

g.

 

13

/4

8

 

 
3.7

 

E

LECTRONIC 

H

EAD 

O

RIENTATION

 

In  order  to  rotate  the  electronic  head  in  the  desired  position  you  must  follow  these  passages

 

(

Figure 7

)

 

unscrew the 4 screws (A) and remove the housing cover (B); 

 

loosen the fixing nut (C) with key CH24 and by hand gently rotate the enclosure (D) in the 

desired position; 

 

once the desired position is reached fix the nut (C) again with the same key and remount 

the housing cover (B). 

 

 

 

Figure 7: rotating the transmitter head 

 

 

W

ARNING

Mount back the housing cover being careful to press the gasket correctly. 

It is NOT necessary to 

turn off the supply 

Summary of Contents for SPRIANO Series

Page 1: ...OPERATING MANUAL MN SST50 ED 17 09 SST50 TORQUE TUBE LEVEL TRANSMITTER ORIGINAL INSTRUCTIONS...

Page 2: ...on of the harmonised standards EN 60079 0 2012 A11 2013 EN 60079 11 2012 The Notified Body NB 1354 Technicka inspekcia a s performed Module D Annex IV Directive 2014 34 EU and issued the Production Qu...

Page 3: ...quirements 7 3 3 Mechanical Installation 8 3 4 External Mounting Displacers 8 3 5 Internal Mounting Displacers 10 3 6 Top Part Orientation 11 3 7 Electronic Head Orientation 13 3 8 Electrical Connecti...

Page 4: ...solutions For more information or for particular problems not considered in this manual please address to our technical office The warranty period is the one contemplated in our general servicing con...

Page 5: ...protection by intrinsic safety level of protection ia IIC Group IIC apparatus fit for substances of group IIC IIB and IIA Temperature Class of the transmitter maximum surface temperature T6 T5 T4 onl...

Page 6: ...to display the data on the wide LCD display The transmitter series SST50 measures liquid levels density and interface levels in closed or open vessels It converts buoyant force exerted by a displacer...

Page 7: ...owing considerations Check whether Transmitter s operating conditions are within the limits as reported in the nameplate technical specifications sheets and or label Make sure that the operating condi...

Page 8: ...department In case of unstable fluids inform technical department In case of damages inform technical department Inspection frequency consideration should be given to applicable national legislation...

Page 9: ...59 Milano Italy Ph 39 0377 919119 Fax 39 0377 855720 Pag 9 48 Strictly follow the bellow sequence Figure 3 remove the adhesive cover from flanges 1 set the Transmitter on plant remove the bottom locki...

Page 10: ...led coaxially with the displacer and fixed either to vessel or to Transmitter flanged connection The well is made from tubing or pipe with an inside diameter 50 80 large than the diameter of the displ...

Page 11: ...1 48 3 6 TOP PART ORIENTATION Before disassembly the TOP PART strictly follow the Step 1 Figure 17 Step 2 Figure 18 and Step 4 Figure 19 indicated in TRANSPORT SECURITY OPERATIONS Step 1 Figure 5 once...

Page 12: ...e Via Rosso Medardo 16 20159 Milano Italy Ph 39 0377 919119 Fax 39 0377 855720 Pag 12 48 Step 2 Figure 6 rotate the top part in the desired direction then slowly put down it ensuring the coaxiality be...

Page 13: ...D ORIENTATION In order to rotate the electronic head in the desired position you must follow these passages Figure 7 unscrew the 4 screws A and remove the housing cover B loosen the fixing nut C with...

Page 14: ...hing WARNING The threaded opening that is not used must be sealed using a suitable cap The caps included in the delivery are only for protection during transport Figure 8 electrical connection INFORMA...

Page 15: ...ia protection The electronic transmitters totally comply with the HART protocol specification Revision 6 0 so they include remote process variable interrogation parameter setting and diagnostics The d...

Page 16: ...Head Office Via Rosso Medardo 16 20159 Milano Italy Ph 39 0377 919119 Fax 39 0377 855720 Pag 16 48 INFORMATION Ref to Figure 10 only one transmitter could be connected to each barrier Ref to Figure 1...

Page 17: ...assification of the zone and for the presence of flammable substances in the plant see MARKING The safety essential requisite against the risk of explosion in the classified areas are fixed from the E...

Page 18: ...sociated apparatus has to be made based on the maximum input parameters of the transmitter Maximum input parameters of the equipment relative to the intrinsically safety Parameter Tamb 60 C Tamb 80 C...

Page 19: ...rthing systems In the case where the plant devoid of earthing it is necessary to connect the earth wire to the terminal block through the cable that carries the signal and the power supply Figure 8 Ca...

Page 20: ...0 Pag 20 48 Figure 14 earthing in the housing WARNING The hose must not be considered as a protection against electric shock for the protection of security but as protection against electromagnetic in...

Page 21: ...put current URV it is referred to the level value which gives 20mA output current PV will be the measurement of the level of the fluid on the displacer in of the displacer length or in engineering uni...

Page 22: ...ode 20 4mA output The direct mode is obtained by setting the lower range point with the lowest value of the range e g 0 mm o 0 kg l and by setting the upper range point with the highest value e g 35 c...

Page 23: ...display is in numerical entering mode the cursor will blink To move the cursor press the button to raise the value of the digit press the button Press the OK button to confirm use instead the MENU bu...

Page 24: ...the actual reference input to the zero display measure The transmitter will then show 0 at display after the confirmation by OK 4mA input automatic setting zero SET LRV At button pushing the transmit...

Page 25: ...nd the firmware revision are shown Password setting PASSWORD Allows to insert a new password for the transmitter To be used with care 0000 9999 Expert command Manual zero elevation ZERO ELEV disabled...

Page 26: ...the steps indicated in this chapter Failure to comply with this section will permanently damage the instrument Before moving the Transmitter strictly follow the bellow sequence of instructions Step 1...

Page 27: ...ice Via Rosso Medardo 16 20159 Milano Italy Ph 39 0377 919119 Fax 39 0377 855720 Pag 27 48 Step 2 Figure 18 screw for seven turns the stop dowel F in order to block the sensor mechanism Step 3 Figure...

Page 28: ...ni LO Italy Head Office Via Rosso Medardo 16 20159 Milano Italy Ph 39 0377 919119 Fax 39 0377 855720 Pag 28 48 Step 4 Figure 19 ensure the top part with appropriate equipment in the indicated hanging...

Page 29: ...AT IT07848810151 Factory Sales Via Gramsci 1 26827 Terranova dei Passerini LO Italy Head Office Via Rosso Medardo 16 20159 Milano Italy Ph 39 0377 919119 Fax 39 0377 855720 Pag 29 48 PROHIBITION Never...

Page 30: ...as a handle or step Please refer to the following pages scheme for troubleshooting In any case contact our technical department for help Condition Potential source Solution The transmitter doesn t tur...

Page 31: ...ble to access the menu Wrong forgotten password Contact us for help 6 1 DISPLAY ERROR CODES Type of error Description OVR OVER RANGE this message is shown if PV is greater than URV by 20 of the span U...

Page 32: ...0377 855720 Pag 32 48 6 2 SPARE PARTS Together with the request of spare parts it is required to indicate Serial Number of the Transmitter to control that the correct components will be delivered Ite...

Page 33: ...va instruments com a TERRANOVA Srl brand www terranova instruments com VAT IT07848810151 Factory Sales Via Gramsci 1 26827 Terranova dei Passerini LO Italy Head Office Via Rosso Medardo 16 20159 Milan...

Page 34: ...8 6 3 DISPLACER SUBSTITUTION Before disassembly the TOP PART strictly follow the Step 1 Figure 17 Step 2 Figure 18 and Step 4 Figure 19 indicated in TRANSPORT SECURITY OPERATIONS Step 1 Figure 23 once...

Page 35: ...Via Rosso Medardo 16 20159 Milano Italy Ph 39 0377 919119 Fax 39 0377 855720 Pag 35 48 Step 2 Figure 24 remove the top locking device A C D then unhook the old displacer insert a new displacer into t...

Page 36: ...ero offset is 4 there are two ways to operate o if the offset has a positive value Ex 6 then you might loosen the nut N with a wrench CH 6 and rotate the screw M from left to right using a wrench CH 7...

Page 37: ...ts or replace any components inside the electronic enclosure with the power supply turned on To avoid injury to health or may damage the equipment always turn the power supply to off and ground the ci...

Page 38: ...so Medardo 16 20159 Milano Italy Ph 39 0377 919119 Fax 39 0377 855720 Pag 38 48 Step 2 Figure 27 maintaining in position the washer and the nut C insert the new electronic head fix the nut C using key...

Page 39: ...nscriptions showing the characteristic data of the instrument Refer to Figure 28 the Transmitter is provided with the following information 1 Name and address of the manufacturer 2 CE marking followed...

Page 40: ...nominal range in factory Low upper range values they can be set within nominal range providing that the span minimum span Damping digitally adjustable from 0 to 60 sec minimum response time 0 1 sec R...

Page 41: ...ard 2 terminals for signal wiring up to 1 5mm 14 AWG Connection for ground and cable shield Mounting see DIMENSIONAL DRAWINGS Net weight see REFERENCE TABLE DESIGNED CONSTRUCTED AND TESTED TO ASME B31...

Page 42: ...955 1158 1564 1869 2174 2479 2763 3393 Weight Kg 33 35 37 41 44 47 50 53 59 TL A 601 855 1058 1464 1769 2074 2379 2683 3293 B 543 797 1000 1406 1711 2016 2321 2625 3235 C 178 305 407 610 762 915 1067...

Page 43: ...va instruments com a TERRANOVA Srl brand www terranova instruments com VAT IT07848810151 Factory Sales Via Gramsci 1 26827 Terranova dei Passerini LO Italy Head Office Via Rosso Medardo 16 20159 Milan...

Page 44: ...ova instruments com a TERRANOVA Srl brand www terranova instruments com VAT IT07848810151 Factory Sales Via Gramsci 1 26827 Terranova dei Passerini LO Italy Head Office Via Rosso Medardo 16 20159 Mila...

Page 45: ...priano terranova instruments com a TERRANOVA Srl brand www terranova instruments com VAT IT07848810151 Factory Sales Via Gramsci 1 26827 Terranova dei Passerini LO Italy Head Office Via Rosso Medardo...

Page 46: ...spriano terranova instruments com a TERRANOVA Srl brand www terranova instruments com VAT IT07848810151 Factory Sales Via Gramsci 1 26827 Terranova dei Passerini LO Italy Head Office Via Rosso Medard...

Page 47: ...spriano terranova instruments com a TERRANOVA Srl brand www terranova instruments com VAT IT07848810151 Factory Sales Via Gramsci 1 26827 Terranova dei Passerini LO Italy Head Office Via Rosso Medard...

Page 48: ...anova instruments com a TERRANOVA Srl brand www terranova instruments com VAT IT07848810151 Factory Sales Via Gramsci 1 26827 Terranova dei Passerini LO Italy Head Office Via Rosso Medardo 16 20159 Mi...

Reviews: