14
STEP 1
Data Cable Installation (Cont.)
2. Follow steps (a) through (e) to thread the data cable into right pedestal
(A3).
(a) Pull out the data cable from the right pedestal base. Cut the zip tie, and
uncurl the data cable.
(b) Place the right pedestal (A3) on the floor as shown, with the bottom end
facing the data cable. Detach the feeder cord (A3a) from the base of the
pedestal, and tie the low end of the feeder cord (A3a) onto the top of the
data cable.
(c) Disconnect the feeder cord at the top of right pedestal (A3).
(d) Pull the feeder cord (A3a) from the top of the right pedestal (A3) as shown,
thus threading the data cable through the right pedestal (A3).
(e) Once the data cable has been threaded through the pedestal, untie the
feeder cord (A3a) from the data cable.
Note: Repeat the same steps for the left pedestal.
A3
A3a
A4
A3a
a
a
b
b
A3
A3a
A3a
A3a
A3
A3a A4
c
c
d
A4
A3a
d
e
A3a
e
Summary of Contents for 4799.304
Page 58: ...58 Your Authorized Distributor...