SK599-AT5
Maintenance truck
Truck
5-4
SPIERINGS MOBILE CRANES USER MANUAL V 0.1
D
ec
2
01
6
C
h
an
ges
an
d t
y
po
gr
ap
hi
c
al
er
ro
rs
res
er
v
ed.
©
20
1
6
S
pi
er
ings
M
obi
le
C
ran
es
–
A
ll r
ight
s
re
se
rve
d
.
5.3.
Maintenance schedule truck
The maintenance schedule relates to the use of the truck under normal operating conditions.
When operating at extraordinary conditions, please consult Spierings Mobile Cranes.
The service issues which take place daily, weekly or bi-monthly, will logically also receive attention at
the annual maintenance.
Explanation of codes in the maintenance schedule
C
=
Check;
CL =
Check level;
L
=
Lubricate;
P
=
Clean (purify);
D
=
Drain;
X
=
Refresh / Replace.
INFORMATION!
Under normal operating conditions is defined as:
•
40-hour working week;
•
15,000 – 30,000 km/year (9,375 - 18,750 miles/year);
•
Ambient temperature between -10 °C up to 30 °C.
CAUTION!
•
If during inspection it reveals that a component is in a bad condition, the
affected component must be replaced immediately!
•
General safety and reliability of the crane at overdue maintenance will be
called into question!