![Speck pumpen BADU Jet Primavera Original Operation Manual Download Page 63](http://html.mh-extra.com/html/speck-pumpen/badu-jet-primavera/badu-jet-primavera_original-operation-manual_1341798063.webp)
5 Installation
12/2014
VG 766.2320.050
EN
63
Installation of formwork for concrete pools
~300
Nub seal
Sealing round cord
Tapping screw
Formwork
Formwork
Inlet connection
! Outlet connection UP !
~240
Fig. 2
Mounting the main housing in a concrete pool with foil lining
Please observe 5.2.3: Aligning the support ring
1
34 106
105
1
1
26
52
27
28
70
Foil
103
30
Fig. 3
Summary of Contents for BADU Jet Primavera
Page 30: ...5 Installation 30 DE VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Abb 12 ...
Page 42: ...9 Instandhaltung 42 DE VG 766 2320 050 12 2014 9 2 Austausch des LED Scheinwerfers ...
Page 72: ...5 Installation 72 EN VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Fig 12 ...
Page 83: ...9 Maintenance 12 2014 VG 766 2320 050 EN 83 9 2 Replacing the LED floodlight ...
Page 115: ...5 Installation 12 2014 VG 766 2320 050 FR 115 46 38 2 38 1 37 37 110 112 Fig 12 ...
Page 128: ...9 Maintenance 128 FR VG 766 2320 050 12 2014 9 2 Remplacement du projecteur LED ...
Page 158: ...5 Installatie 158 NL VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Afb 12 ...
Page 170: ...9 Onderhoud 170 NL VG 766 2320 050 12 2014 9 2 Vervangen van de LED spot ...
Page 202: ...5 Installazione 202 IT VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Fig 12 ...
Page 214: ...9 Manutenzione 214 IT VG 766 2320 050 12 2014 9 2 Sostituzione del proiettore a LED ...
Page 245: ...5 Instalación 12 2014 VG 766 2320 050 ES 245 46 38 2 38 1 37 37 110 112 Fig 12 ...
Page 257: ...9 Mantenimiento 12 2014 VG 766 2320 050 ES 257 9 2 Sustitución del reflector LED ...