HANG DOOR
Fit the doors by fixing the hinges to the pre-drilled holes in
the door jambs. Fit the padbolt and keeper to the front of
the doors. To finish, fix padbolts to the inside, top and
bottom of the door with the seal attached.
NOTE:
The diagram below shows a flat roof shed. The assembly process is the same for all sheds.
1
3
Drill pilot holes into the
inside of the front wall
bottom channel to
accommodate the
padbolt keeper and
then fix with self
tapping screws
Drill pilot holes
into the inside of
the door frame of
the second door
next to the door
seal and then fix
with self tapping
screws.
Drill pilot holes to accommodate
the padbolt keeper and then fix
with self tapping screws
2
PAGE 36
Summary of Contents for Fasttrak WorkShop 2010
Page 20: ...PAGE 20 FRONT WALL PANEL ...
Page 44: ...NOTES PAGE 44 ...