![Spanbilt Fasttrak WorkShop 2010 Assembly Instructions Manual Download Page 9](http://html.mh-extra.com/html/spanbilt/fasttrak-workshop-2010/fasttrak-workshop-2010_assembly-instructions-manual_1339370009.webp)
PORTAL FRAME ASSEMBLY
PAGE 9
3
4
LEG
LEG
ROOF BEAM
ROOF BEAM
ROOF BEAM
ROOF BEAM
All four Roof Beams
are required to be
boxed as shown
Screw the boxed legs together using the Tek Screws (portal)
Screw the boxed roof beams together using the Tek Screws (portal)
Screws should be through the center of the beam
First screw should be minimum 200mm
away from the outer edge.
LEG
LEG
Screws should be through the center of the beam
Bracing “X”
Use bracing channel “X” to temporarily hold it in place.
Join the bracing channels to the length of 2710mm.
Bracing “X”
Summary of Contents for Fasttrak WorkShop 2010
Page 20: ...PAGE 20 FRONT WALL PANEL ...
Page 44: ...NOTES PAGE 44 ...