background image

8

F

A

C

D

B

E

G

H

GH3/4T GANTRY SPECIFICATIONS

 *15 ft & 5m Gantry lifts have 2 span adjustments. 3m, 4m, 12 ft and 10 ft models have 1 span adjustment. 8 ft models have no span adjustment.

A

B

C

D

E

F

G

H

Part No.

Gantry Model

Max/Min  

Height To  

Lifting Eye

Max 

Height  

To Top Of 

Trolley

Max  

Working  Span

Span Between 

Wheels

Height  

Adjust-

ment

Span  

Adjust-

ment*

Max 

Width 

Of "A" 
Frame

Stored 
Height 

of "A" 

Frame

785301

GH3/4T-15 (15' / 8"casters)

116"

(294.6 cm)

86"

(218.4 cm)

128.75"

(327.0 cm)

154"  (391.2 cm)

172" (436.9 cm)

6"  

(15.2 cm)

9"

(22 cm)

60.625"  

(154 cm)

100"  

(254 cm)

785303

GH3/4T-12 (12' / 8" casters)

118" (299.7 cm)

136” (345.4 cm)

785305

GH3/4T-10 (10' / 8" casters)

94" (238.8 cm)

112” (284.5 cm)

785307

GH3/4T-8 (8' / 8" casters)

70" (177.8 cm)

88” (223.5 cm)

785311

GH3/4T-3 (3m / 8” casters)

92” (233.7 cm)

110” (279.4 cm)

785313

GH3/4T-4 (4m / 8” casters)

131.5 (334.0 cm) 149.5” (379.7 cm)

785315

GH3/4T-5 (5m / 8” casters)

166” (421.6 cm)

184” (467.4 cm)

785300

GH3/4T-15 (15' / 10" wheels)

118"

(299.7 cm)

88"

(223.5 cm)

130.5"

(331.5 cm)

154"  (391.2 cm) 167.5" (425.5 cm)

785302

GH3/4T-12 (12' / 10" wheels)

118" (299.7 cm) 131.5” (334.0 cm)

785304

GH3/4T-10 (10' / 10" wheels)

94" (238.8 cm)

107.5” (273.1 cm)

785306

GH3/4T-8 (8' / 10" wheels)

70" (177.8 cm)

83.5” (212.1 cm)

785310

GH3/4T-3 (3m / 10” wheels)

92” (233.7 cm)

105.5” (268.0 cm)

785312

GH3/4T-4 (4m / 10” wheels)

131.5 (334.0 cm)

145” (368.3 cm)

785314

GH3/4T-5 (5m / 10” wheels)

166” (421.6 cm) 179.5” (455.9 cm)

Summary of Contents for Sumner GH3/4T-15

Page 1: ...88 phone 281 999 6900 fax 281 999 6966 UNITED KINGDOM Unit 3 Kempton Road Keytec 7 Business Park Pershore Worcestershire WR10 2TA UK phone 44 01386 556278 fax 44 01386 556776 NETHERLANDS Midden Engweg 21 NL 3882TS Putten Netherlands europeansales sumner com phone 31 0 85 489 0284 CANADA 75 Saltsman Drive Unit 5 Cambridge ON N3H 4R7 phone 519 653 5300 fax 519 653 5305 Sumner Manufacturing Company L...

Page 2: ... death CAUTION Hazards or unsafe practices which could result in minor personal injury product or property damage IMPORTANT Indicates information or instructions that are necessary for proper operation and or maintenance Index Introduction 3 Gantry Components 3 Operator Safety Instructions 3 GH3 4T Gantry Lift Assembly 3 6 1 Erect A Frame 4 2 Assemble Components 5 6 Gantry Height Adjustment 6 7 1 ...

Page 3: ...t to operate the equipment at more than the recommended capacity 7 No riders on unit This unit was designed for material lifting purposes ONLY and is not designed to function as a personnel lift or carrier 8 NEVER stand under an elevated load 9 NEVER exceed rated load capacity 10 NEVER operate during high winds or electrical storms 11 NEVER use Gantry lift to support ladders or other climbing devi...

Page 4: ...g until the button clicks in place locking the leg in the open position Repeat process for second A frame 3 Lock all casters on both A frames by pushing down on caster brake mechanism 4 Casters can be locked at 90 degree angles to make transport easier To lock caster at a 90 degree angle flip the caster lock lever as indicated in above illustration 5 Position A frames as necessary at either end of...

Page 5: ...m Center trolley on cross beam and tighten with set screw 4 Lift cross beam end without bolt inserted and position on A frame lining up outside bolt hole on A frame with desired bolt hole on cross beam 5 Place bolt through bolt hole on A frame and cross beam with washers on either side of the bolt Loosely tighten so A frame can swivel when A frame is erected 6 Erect one A frame and line up inside ...

Page 6: ...N NEVER attempt to adjust the height while the lift is holding a load CAUTION Be certain trolley is centered and held in place with set screw before attempting to adjust A frame height 2 Adjust lifting handle location Release the plunger pin on the lifting handle and slide handle to desired position most convenient for lifting or lowering A frame height Release plunger pin and be certain it locks ...

Page 7: ...s have no span adjustments To make span adjustments during assembly simply place the outermost bolt on the A Frame in the second or third inside bolt hole on the beam It is not neces sary to adjust the span symmetrically on either end of the beam Moving Gantry Lift CAUTION It is not recommended to move Gantry lift with a load When moving Gantry lift with a load be sure to secure trolley in center ...

Page 8: ...2 12 8 casters 118 299 7 cm 136 345 4 cm 785305 GH3 4T 10 10 8 casters 94 238 8 cm 112 284 5 cm 785307 GH3 4T 8 8 8 casters 70 177 8 cm 88 223 5 cm 785311 GH3 4T 3 3m 8 casters 92 233 7 cm 110 279 4 cm 785313 GH3 4T 4 4m 8 casters 131 5 334 0 cm 149 5 379 7 cm 785315 GH3 4T 5 5m 8 casters 166 421 6 cm 184 467 4 cm 785300 GH3 4T 15 15 10 wheels 118 299 7 cm 88 223 5 cm 130 5 331 5 cm 154 391 2 cm 1...

Reviews: