Thank you for choosing Sumner’s GH3/4T Gantry Lift 
to meet your material lifting needs. The GH3/4T Gantry 
Lift has a load capacity of 3/4 metric tons (750 kg) or 
1,650 lbs. Following proper procedures for use and 
maintenance of Sumner’s GH3/4T Gantry Lift de-
scribed in this manual will provide you with years of  
dependable service. 

Gantry Components

Sumner’s GH3/4T Gantry Lift consists of the below  
components. Before attempting to assemble Gantry 
Lift be certain that all components are available.

•  2 - A-frames
•  Cross Beam (3m, 4m, 5m, 8', 10', 12' or 15')
•  Trolley
•  Attaching hardware (4 bolts, 4 nuts & 8 washers)

Operator Safety Instructions

IMPORTANT

Read and understand this manual 
prior to operating or performing main-
tenance on this lift.

1.  

ALWAYS

 Inspect all equipment prior to use to 

make certain it is in proper working order.

2.  

NEVER

 use unit If any part of equipment appears 

damaged or does not assemble properly.

3. 

ALWAYS

 use only Sumner replacement parts. Any 

replacement parts not supplied by Sumner  
Manufacturing will severely compromise the  
quality and safety designed into this unit as well as 
invalidate the warranty.

4.  As a precaution, 

ALWAYS

 wear proper  

clothing when operating unit, including hard hat, 
work gloves and safety shoes.

5. 

ALWAYS

 avoid horseplay around equipment, and 

keep bystanders at a safe distance. Do not allow 
children to operate this unit and always keep them 
out of work areas.

6. 

NEVER

 misuse the unit. Perform only the  

functions for which the unit is designed. Never at-
tempt to operate the equipment at more than the 
recommended capacity.

7.  No riders on unit. This unit was designed for  

material lifting purposes ONLY and is not designed 
to function as a personnel lift or carrier.

8. 

NEVER

 stand under an elevated load.

9. 

NEVER

 exceed rated load capacity.

10. 

NEVER

 operate during high winds or electrical 

storms.

11. 

NEVER

 use Gantry lift to support ladders or other 

climbing devices.

12. When possible 

ALWAYS

 move loads by moving 

the trolley on the Gantry cross beam while the lift 
is stationary with all casters locked.

13. It is not recommended to move the Gantry lift with 

a load. When moving the Gantry lift with a load 
be sure to secure trolley in center of cross beam 
to evenly distribute the weight across the unit and 
lower load as close to the ground as possible. 
Move lift by pushing the Gantry, not the load.

14. 

NEVER

 leave a load on the Gantry lift  

unattended.

15. 

ALWAYS

 adjust A-frame heights prior to attaching 

a load and make certain cross beam is level prior 
to attaching a load. See instructions in this manual 
on how to adjust A-frame heights.

16. 

NEVER

 adjust A-frame heights without first 

 

securing trolley to center of cross beam.

17. 

ALWAYS

 use Gantry lift on a hard, level, smooth 

surface that is free of debris and obstructions. Be 
certain the surface the Gantry is on can support 
the full weight of the intended load.

18. 

NEVER

 move a fully assembled Gantry lift using a 

fork lift or other lifting device.

19. 

NEVER

 use Gantry lift as an electrical ground.

20. 

ALWAYS

 ensure load is not secured to the ground 

before attempting to lift it.

GH3/4T Gantry Lift Assembly

The following tools are required to properly assemble 
the GH3/4T Gantry Lift:

•  1" wrench
•  1" socket wrench
•  Ladder

Summary of Contents for Sumner GH3/4T-15

Page 1: ...88 phone 281 999 6900 fax 281 999 6966 UNITED KINGDOM Unit 3 Kempton Road Keytec 7 Business Park Pershore Worcestershire WR10 2TA UK phone 44 01386 556278 fax 44 01386 556776 NETHERLANDS Midden Engweg 21 NL 3882TS Putten Netherlands europeansales sumner com phone 31 0 85 489 0284 CANADA 75 Saltsman Drive Unit 5 Cambridge ON N3H 4R7 phone 519 653 5300 fax 519 653 5305 Sumner Manufacturing Company L...

Page 2: ... death CAUTION Hazards or unsafe practices which could result in minor personal injury product or property damage IMPORTANT Indicates information or instructions that are necessary for proper operation and or maintenance Index Introduction 3 Gantry Components 3 Operator Safety Instructions 3 GH3 4T Gantry Lift Assembly 3 6 1 Erect A Frame 4 2 Assemble Components 5 6 Gantry Height Adjustment 6 7 1 ...

Page 3: ...t to operate the equipment at more than the recommended capacity 7 No riders on unit This unit was designed for material lifting purposes ONLY and is not designed to function as a personnel lift or carrier 8 NEVER stand under an elevated load 9 NEVER exceed rated load capacity 10 NEVER operate during high winds or electrical storms 11 NEVER use Gantry lift to support ladders or other climbing devi...

Page 4: ...g until the button clicks in place locking the leg in the open position Repeat process for second A frame 3 Lock all casters on both A frames by pushing down on caster brake mechanism 4 Casters can be locked at 90 degree angles to make transport easier To lock caster at a 90 degree angle flip the caster lock lever as indicated in above illustration 5 Position A frames as necessary at either end of...

Page 5: ...m Center trolley on cross beam and tighten with set screw 4 Lift cross beam end without bolt inserted and position on A frame lining up outside bolt hole on A frame with desired bolt hole on cross beam 5 Place bolt through bolt hole on A frame and cross beam with washers on either side of the bolt Loosely tighten so A frame can swivel when A frame is erected 6 Erect one A frame and line up inside ...

Page 6: ...N NEVER attempt to adjust the height while the lift is holding a load CAUTION Be certain trolley is centered and held in place with set screw before attempting to adjust A frame height 2 Adjust lifting handle location Release the plunger pin on the lifting handle and slide handle to desired position most convenient for lifting or lowering A frame height Release plunger pin and be certain it locks ...

Page 7: ...s have no span adjustments To make span adjustments during assembly simply place the outermost bolt on the A Frame in the second or third inside bolt hole on the beam It is not neces sary to adjust the span symmetrically on either end of the beam Moving Gantry Lift CAUTION It is not recommended to move Gantry lift with a load When moving Gantry lift with a load be sure to secure trolley in center ...

Page 8: ...2 12 8 casters 118 299 7 cm 136 345 4 cm 785305 GH3 4T 10 10 8 casters 94 238 8 cm 112 284 5 cm 785307 GH3 4T 8 8 8 casters 70 177 8 cm 88 223 5 cm 785311 GH3 4T 3 3m 8 casters 92 233 7 cm 110 279 4 cm 785313 GH3 4T 4 4m 8 casters 131 5 334 0 cm 149 5 379 7 cm 785315 GH3 4T 5 5m 8 casters 166 421 6 cm 184 467 4 cm 785300 GH3 4T 15 15 10 wheels 118 299 7 cm 88 223 5 cm 130 5 331 5 cm 154 391 2 cm 1...

Reviews: