PREPARATION
-8-
For Machines Mfd Since 1/21
South Bend Tools
Model SB1493
P R E P A R A T I O N
Preparation Overview Required for Setup
The items listed below are required to
successfully set up and prepare this machine for
operation
For Power Connection
• A power source that meets the minimum
circuit requirements for this machine (Refer
to the Power Supply Requirements
section for details )
For Assembly
• Safety Glasses for Each Person
• Disposable Rags
• Disposable Gloves
• Cleaner/Degreaser
• Mounting Hardware (As Needed)
• (2) Open-End Wrenches
7
⁄
16
"
• (2) Buffing Wheels with
5
⁄
8
" Arbor
The purpose of the preparation section is to help
you prepare your machine for operation The list
below outlines the basic process Specific steps
for each of these points will be covered in detail
later in this section
The typical preparation process is as follows:
1.
Unpack the machine and inventory the
contents of the box/crate
2.
Clean the machine and its components
3.
Identify an acceptable location for the
machine and move it to that location
4.
Bolt the machine to a workbench or stand
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation
6.
Connect the machine to the power source
7.
Test run the machine to make sure it
functions properly and is ready for operation
Incorrect use of this
machine can result in
death or serious injury.
For your own safety, read
and understand this entire
document before using.
Wear safety glasses during
the entire setup process!
HEAVY LIFT!
Straining or crushing injury
may occur from improperly
lifting machine. To reduce
this risk, get help from other
people or lifting equipment
rated for weight of this
machine.