PREPARATION
-10-
For Machines Mfd. Since 11/21
South Bend Tools
Model SB1125
P R E P A R A T I O N
Preparation Overview Required for Setup
The items listed below are required to
successfully set up and prepare this machine for
operation.
For Lifting
• A forklift or other power lifting device rated
for the weight of the machine.
• Lifting
sling (rated for at least 650 lbs.).
For Power Connection
• A power source that meets the minimum
circuit requirements for this machine. (Refer
to the Power Supply Requirements
section on Page 11 for details.)
• A qualified electrician to ensure a safe and
code-compliant connection to the power
source.
For Assembly
• Disposable Rags
• Cleaner Degreaser
• Safety Glasses (for each person)
• Disposable Gloves
• Open-End Wrench
13mm
• Another Person
• Mounting Hardware (As Needed)
• Acetone or Lacquer Thinner
• Block of Wood
• Hex Wrench
3
⁄
16
"
The purpose of the preparation section is to help
you prepare your machine for operation. The list
below outlines the basic process. Specific steps
for each of these points will be covered in detail
later in this section.
The typical preparation process is as follows:
1.
Unpack the machine and inventory the
contents of the box/crate.
2.
Clean the machine and its components.
3.
Identify an acceptable location for the
machine and move it to that location.
4.
Either bolt machine to the floor or place it on
mounts.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation.
6.
Connect the machine to the power source.
7.
Test run the machine to make sure it
functions properly and is ready for operation.
Incorrect use of this
machine can result in
death or serious injury.
For your own safety, read
and understand this entire
document before using.
Wear safety glasses during
the entire setup process!