Page 8
CT12F
960.064 Rev # 0
fasteners previously installed.
6.
Snap them together by applying pressure to
backbox inner flange and support bridge. (please
see fig. 10)
7.
Carefully slide the assembly into the opening.
8.
Center the assembly and fasten to the ceiling by
bending the two clips located at the flanges of the
support bridge. (please see fig. 11) NOTE: Proper
orientation is with the longer legs parallel to the 12"
ceiling opening.
9.
Proceed to the “Installing the Loudspeaker” section
on these installation instructions for the selected
loudspeaker and bezel combination.
DROP TILE CEILING INSTALLATIONS
NEW CONSTRUCTION
These instructions apply if you will be installing a
CT12F/FT with a FMB-FS Bezel or a CT12FH/FHT with
a FMB-F Bezel into drop tile ceilings, prior to the
installation of the ceiling grid system.
IF A PBB1.2S BACKBOX IS NOT REQUIRED (
VERIFY THAT LOCAL CODES DO NOT REQUIRE A
BACKBOX):
The TBS12S Support Bridge can be installed after
the ceiling has been completed.
Please follow the instructions for “Drop Tile
Ceiling Installations - Existing Construction”.
IF A PBB1.2S BACKBOX IS REQUIRED:
1.
Locate the PBB1.2S Backbox. Identify mounting
holes and wire-pass holes on the backbox. Re-
move compound knockouts as required.
2.
Locate the TBS12S Support Bridge and insert the
serrated fasteners (provided with the Backbox) into
the four holes. (please see fig. 12)
3.
Align and mate the parts together by pressing the
backbox against the support bridge.(see Fig 13)
fig. 12
fig. 9
fig. 10
fig. 11