EXISTING CONSTRUCTION

These instructions apply if you will be installing a

CT12FH/FHT with a FMB-F or a CSB-F Bezel on
concealed spline ceilings.

IF A PBB1.2S BACKBOX IS NOT REQUIRED (

VERIFY THAT LOCAL CODES DO NOT REQUIRE A

BACKBOX):

1.

Locate where the loudspeaker is to be placed and

remove the  12" x 12" tile.

2.

Proceed to the “Installing the Loudspeaker” section

on these installation instructions for the selected
loudspeaker and bezel combination.

IF A PBB1.2S BACKBOX IS REQUIRED:

1.

Identify loudspeaker mounting location and remove

the  12" x 12" tile.

2.

Locate  the PBB1.2S Backbox. Identify conduit and

wire-pass holes. Remove compound knockouts as
required.

3.

Bring speaker wiring into the backbox and fasten

properly.

4.

Align the backbox in the opening.  While holding

the backbox in place, drill through the perforated
flanges and into the spline utilizing four (4) #8
sheet metal screws. (please see fig. 20)

5.

Proceed to the “Installing the Loudspeaker” section

on these installation instructions for the selected
loudspeaker and bezel combination.

SURFACE MOUNT INSTALLATION

These instructions apply if you are installing a

CT12FH/CT12FHT with a FMB-F Bezel and a
SMBOX12

1.

Position the enclosure in the projected location and

mark mounting holes on surface.

2.

Remove enclosure. Drill pilot holes as required by

the fastening hardware to be employed, and
depending on the surface where the enclosure is to
be mounted. (please see fig. 21)

3.

Conduit knockouts are not supplied in the

SMBOX12.The SMBOX12 may be pre-drilled to
accommodate any  standard cabling or conduit
hookups.It is recommended that you pre-drill the
SMBOX12, prior to mounting it to the wall or other
surface, and before any paint or other finish
application.

4.

Align the enclosure with the drilled holes and

mount to the surface.  NOTE: Foam or felt tape
may be placed between surface and enclosure to
reduce vibrations if permitted by local codes.

5.

If not previously done, run speaker wires or

conduit (as per local Building Code requirements)
into the SMBOX12. Fasten and seal as required.

fig. 20

fig. 21

fig. 19

Summary of Contents for CT12F

Page 1: ...d CT12FHT REQUIRED ACCESSORIES See text TECHNICAL SPECIFICATIONS DIMENSIONS Unless otherwise specified all dimensions are in inches mm PRODUCTWEIGHT CT12F 2 4 lbs 1 11 KG CT12FT 3 0 lbs 1 36 kg CT12FH...

Page 2: ...color requirements using conventional brush on roller or airless spray application systems RECOMMENDED ENVIRONMENTS Indoor or Weather Protected Outdoor ACCESSORIES DATA CT12F SERIES BEZELS AND INSTAL...

Page 3: ...14 56 370 12 33 313 11 38 289 10 50 266 11 90 302 9 00 228 10 00 254 11 90 302 8 00 203 10 46 266 39 10 12 45 316 9 04 230 9 05 230 12 45 316 PBB1 2S Custom size Backbox Weight 5 20 lbs 2 36 kg Custom...

Page 4: ...PECTION Carefully open the shipping cartons and remove all contents Inspect the product and accessories for damage Report damage or shortages to SOUND ADVANCE SYSTEMS INC immediately CT12FH FHT INSTAL...

Page 5: ...CODES DO NOT REQUIRE A BACKBOX 1 Locate and identify future speaker placement 2 Locate the TBS12S Support Bridge 3 If studs joists are 24 between centers secure the TBS12S Support Bridge to the front...

Page 6: ...lled in the support bridge please see fig 3 Snap them together by applying pressure between the backbox inner flanges and the support bridge please see fig FIG 4 and 5 4 If not previously done run spe...

Page 7: ...e support bridge please see fig 8 5 If not previously done run speaker wires or conduit as per local Building Code requirements into the backbox Fasten and seal as required 6 Proceed to the Installing...

Page 8: ...f you will be installing a CT12F FT with a FMB FS Bezel or a CT12FH FHT with a FMB F Bezel into drop tile ceilings prior to the installation of the ceiling grid system IF A PBB1 2S BACKBOX IS NOT REQU...

Page 9: ...Bezel on drop tile ceilings IF A PBB1 2S BACKBOX IS NOT REQUIRED VERIFY THAT LOCAL CODES DO NOT REQUIRE A BACKBOX 1 Locate a ceiling tile and place on a clean work surface with the patterned surface...

Page 10: ...o the opening 8 Fasten the assembly to the tile by bending the two clips located at the flanges of the support bridge please see fig 18 9 Proceed to the Installing the Loudspeaker section on these ins...

Page 11: ...Installing the Loudspeaker section on these installation instructions for the selected loudspeaker and bezel combination SURFACE MOUNT INSTALLATION These instructions apply if you are installing a CT...

Page 12: ...n aid please see fig 23 fig 23 fig 24 3 Holding the loudspeaker by the installation aid connect the speaker wiring to the correct and loudspeaker pigtails or desired transformer taps using a suitable...

Page 13: ...ce please see fig 26 INSTALLINGTHE CT12FH FHTWITHTHE CSB F CONCEALED SPLINE BEZEL 1 Carefully insert the loudspeaker into the installa tion aid SEE FIG 27 Holding the loudspeaker by the installation a...

Page 14: ...in contact with the back of the loud speaker surface to avoid any noise or damage to the system when in operation INSTALLINGTHE CT12F FTWITHTHE FMB FSTORSION SPRING BEZEL 1 Place the loudspeaker on a...

Page 15: ...uspended from the support bridge please see fig 32 6 Using equal pressure directly under the torsion springs carefully push the bezel towards the surface until flush If a situation should arise which...

Reviews: