81
Installation
1.
Pass the flexible board of the 2nd Group Assy through the hole of the 3rd Group Assy.
2.
Align the arc-shaped notch with the end of gear, and then attach the 3rd Group Assy.
3.
Attach the 2nd Group Assy, and then turn the tube Lubricating Block Assy counterclockwise to expose the three Shutter Springs
attaching location.
.
4.
Attach the three Shutter Springs to the hooks. (Attach the Iris Spring in the order of hook (a) and hook (b) as shown in the
figure.)
5.
Turn the Tube Lubricating Block Assy counterclockwise to the maximum extent.
6.
Assemble the lens unit. (Refer to “4-3-2. Group Frame Block Assy Replacing Method”)
2nd Group Assy
3rd Group Assy
Tube Lubricating
Block Assy
Shutter Spring
attaching location.
Tube Lubricating
Block Assy
End of gear
Arc-shaped
notch
Flexible board
Hole
Shutter Spring
Shutter Springs
2nd/3rd Group Assy
Hook (b)
Hook (a)
Iris Spring
Sony CONFIDENTIAL
For Authorized Servicer
SYS SET
2020/05/28 23:46:49 (GMT+09:00)