![Sony BKDS-7017 Installation Manual Download Page 64](http://html.mh-extra.com/html/sony/bkds-7017/bkds-7017_installation-manual_400440064.webp)
5-12
DVS-7150E IM
(5) Connect the digital voltmeter between test terminals on the CPU-264 board and confirm that the
voltage value of each test connector meet the specification shown in the table below.
If the specification does not meet, adjust the voltage by the adjustment potentiometers of the power
unit B.
(6) Turn on the power switches of the power units A and B.
(7) Confirm that the indicators of the power units A and B light. If an indicator of both does not light, re-
carry out from the step (1) of “procedures for power unit B”.
Voltage
Specifications
Test connector
Adjustment potentiometer
+
5 V
+
5.05
±
0.02 V
CPU-264 board
RE-115A board
CNT3 (
+
5 V)
→→
CNT7 (GND)
1
RV201
+
3 V
+
3.35
±
0.02 V
CPU-264 board
RE-115A board
CNT4 (
+
3 V)
→→
CNT7 (GND)
1
RV203
_
5 V
_
5.05
±
0.02 V
CPU-264 board
RE-115A board
CNT6 (
_
5 V)
→→
CNT7 (GND)
1
RV202
5-3. Adjustment of Secondary Power Supply Voltage
CPU-264 board
Adjustment driver
RV201 RV202
RV203
5V
_
5V 3.3V
5V
3V
_
5V
CNT3
CNT4
CNT6
5V
3V
_
5V
CNT7
GND
D15 (B5)
D16 (B5)
D18 (B5)