2
DVS-7000AE IM
4. Installation of Options
4-1.
Installation of Plug-in Boards ..................................................................... 4-2
4-2.
Combination of Optional boards ................................................................. 4-4
4-2-1.
Function of Optional Boards ...................................................... 4-4
4-2-2.
Relation between Optional Boards and
Rear Panel Connectors ............................................................... 4-4
4-3.
Installation of Options for DVS-7000A ...................................................... 4-6
4-3-1.
Detaching and Attaching of Front Panel .................................... 4-6
4-3-2.
Inserting/Pulling Out of Plug-in Boards .................................... 4-7
4-3-3.
Installation of Optional Boards .................................................. 4-9
4-3-4.
Installation of BKDS-7690 (Redundant Power Supply Unit) .. 4-12
4-4.
Installation of Options for Control Panel .................................................. 4-13
4-4-1.
Opening and Closing of Panel .................................................. 4-13
4-4-2.
Turning On/Off the Power Switch ........................................... 4-14
4-4-3.
Installation of BKDS-7001 (Control Port Expansion Board) .. 4-15
4-4-4.
Installation of BKDS-7031 Track Ball .................................... 4-16
4-4-5.
Installation of Option Panels (BKDS-7030/7031/7032/7033) . 4-18
4-4-6.
Joining of BKDS-7075 (Control Panel Remote Adaptor) ....... 4-29
4-4-7.
Installation of BKDS-7090 (Redundant Power Supply Unit) .. 4-33
5. Confirmation in Installation
5-1.
Switch Settings on Boards and LEDs Description ...................................... 5-1
5-1-1.
DVS-7000A ................................................................................ 5-1
5-1-2.
BKDS-7133 ................................................................................ 5-6
5-1-3.
Control Panel .............................................................................. 5-6
5-1-4.
BKDS-7090 .............................................................................. 5-12
5-2.
Adjustment of Secondary Power Supply Voltage ..................................... 5-13
5-2-1.
DVS-7000A .............................................................................. 5-13
5-2-2.
Control Panel ............................................................................ 5-15
5-3.
Adjustment of Operation Power for Fader Lever ..................................... 5-17
6. Initial Set-up of System
6-1.
Operation and Saving of Set-up Data .......................................................... 6-1
6-2.
Installation of Program (BZS-7020A) ........................................................ 6-4
6-2-1.
Down Load of Program .............................................................. 6-5
6-2-2.
Initializing of Data on RAM ...................................................... 6-7
6-2-3.
Initializing of “Nonvolatile Memory” ........................................ 6-8
6-3.
Set-up .......................................................................................................... 6-9
6-3-1.
Confirmation of the Software Version ..................................... 6-10
6-3-2.
Setting of the Signal Format .................................................... 6-10
6-3-3.
Setting about the System .......................................................... 6-11
6-3-4.
Saving Set-up Data to Nonvolatile Memory ............................ 6-12