DVS-7000AE IM
4-25
4-4. Installation of Options for Control Panel
3. Installation to Main Panel (BKDS-7011R/7011LR)
(1) Open the panel. (Refer to “4-4-1. Opening and Closing of Panel”.)
(2) Turn off the power switch in the control panel. (Refer to “4-4-2. Turning On/Off the Power Switch”.)
(3) Remove the blank panel.
(Refer to the step (3) of “1. Installation to Main Panel (BKDS-701x)” in the section 4-4-5.)
(4) Put option panel to the position with removed the blank panel at the step (3) and secure it by the
supplied four screws (PSW3
x
8).
(5) Disconnect the harness of the CN18 on the CN-1143 board and replace it option panel CN1, and
secure it with harness clamper.
Option panel
PWH3
x
8
PWH3
x
8
PWH3
x
8
PWH3
x
8
CN1143 board
CN18
CPU-191 board
CN7
Clanp
Option panel