50
STARTUP GUIDELINES FOR UNITS EQUIPPED WITH A DM MODULE
1
.
Follow normal startup procedure regarding Electrical Check, General Installation Check,
Plumbing Installation Check as noted on the Startup Checklist.
2. Mark a fill line on the inside of the tank 7” deep.
3. Fill the pulper. Once the pulper has stopped filling, check water level and adjust if needed,
press the green start button and allow the unit to run for 30 seconds.
4. Press Stop pushbutton.
5.
Press Drain pushbutton.
6.
With a timer, press the Green pushbutton once and time the water level to the fill line.
7.
Using the seconds that it took to fill to the line, use the tables above to find the set points.
8.
The power must be on to the PLC. If the date/time is displayed on the DM Module, then you
are ready to proceed. If not, push the “ESC” button to display the date/time. Then press the
“OK” button twice to display the “D” register(s).
From the Date/Time screen, after pushing the “OK” button twice, the DM Module will go to the
last “D” register that was modified.
The “D” number is displayed on the bottom of the DM Module screen. The value of that “D”
number is on the right-hand side of the screen. If you are on “D” with a zero on the bottom of
the screen, you are in “D0”.
To change prefill time press OK once (enter value found in table above) and the value on the
right side of the screen will flash. Push the “+” value to increase the value and the “-“ button to
decrease the value. Once the value is the desired value, press “OK”.
To go to D1 for a close couple machine and D11 for remote machines, press the “+” button
once, if D2, press the “+” button twice, for instance.
Summary of Contents for SPC-50S
Page 12: ...12 Installation ...
Page 23: ...23 Start Up ...
Page 26: ...26 Operation ...
Page 31: ...31 CLEANING YOUR SYSTEM ...
Page 34: ...34 MAINTENANCE ...
Page 43: ...43 TROUBLESHOOTING ...
Page 47: ...47 Display Module Instructions ...
Page 52: ...52 165 Independence Ct Lancaster Pa 17601 Ph 800 237 6628 service somatcompany com ...