3.2 Installation spacing
In order to ensure good ventilation of the energy storage integrated machine,
please reserve enough installation spacing around the machine during
installation.
Position
Min spacing
Remark
Side spacing
100cm
Back spacing
10cm
It needs to be installed against the wall
Note
: For detailed requirements about the narrowest maintenance channel, escape
route, etc., refer to the applicable standards of the country/ region where the
project is located.
3.3 Wire specifications
In order to standardize the specification of ac and dc connectors or terminals of
compatible inverters, the following requirements are required for connecting ac
and dc wires of corresponding types of inverters
PV side
GRID side
Load
It is recommended to use 4
mm
²
of wire
It is recommended to use 4
mm
²
of wire
It is recommended to use 4
mm
²
of wire
3.4 Installation step
3.4.1 Unpacking confirmation
Before unpacking, check carefully whether the product information in the order is
consistent with that on the nameplate of the package box, and whether the product
package is intact. If there is any question, please contact the supplier timely.
Store the idled machine in its original package, and take anti-moisture and anti-dust
measures. after taking the machine out of the box, check the following items:
Item Name
Qty (pcs) Remark
1
System case
1
2
Battery module
1
3
key
1
4
Screws-M6*12
10
5
Screws-M5*8
1
6
Screws-M4*6
6
7
Expansion bolts-M8*100
4
8
Module mounting bracket
1
9
Wall mounting bracket
1
10
PV connector removal tool
1
Summary of Contents for S4 EU-A36
Page 1: ...1 52 User Manual Home Energy Storage System Soluna S4 EU A36 Oct 2020 Revision A 1 ...
Page 18: ...18 52 Figure 2 5 Appearance Number Name Remark Door lock of system Door Key ...
Page 30: ...30 52 Step7 Electrical connection Figure 3 7 Electrical connection ...
Page 35: ...35 52 PV information Load information Grid information ...