7
/
52
1.2 Safety guide
• After receiving this product, first confirm the product package is intact.
If any question, contact the logistic company or local distributor
immediately.
• The installation and operation of the machine must be carried out by
professional technicians who have received professional trainings, and
thoroughly familiar with all the contents in this manual and the safety
requirements of the electrical system.
• Do not carry out connection/disconnection, unpacking inspection and
unit replacement operations on the machine when power source is
applied. before wiring and inspection, users must confirm the breakers
on DC and AC side of inverter are disconnected and wait for at least 10
minutes
• Ensure there is no strong electromagnetic interference caused by other
electronic or electrical devices around the installation site.
• Do not refit the machine unless authorized.
• All the electrical installation must conform to local and national
electrical standards.
• Ground with proper technics before operation
• Do not open the surface cover of the machine unless authorized. The
electronic components inside the machine are electrostatic sensitive.
Do take proper anti-electrostatic measures during authorized operation.
• Do not touch the housing of the machine or the radiator to avoid scald
as they may become hot during operation
• The machine needs to be reliably grounded.
• Ensure that DC and AC side circuit breakers have been disconnected
and wait at least 10 minutes before wiring and checking.
Note: Technical personnel who can perform installation, wiring, commissioning,
maintenance, troubleshooting and replacement of the energy storage inverters must
meet the following requirements:
• Operators need professional training.
• Operators must read this manual completely, and master the related safety
precautions.
• Operators need to be familiar with the relevant safety regulations for electrical
systems.
• Operators need to be fully familiar with the composition and operating principle of the
entire energy storage system, and related standards of the countries/regions in which
the project islocated.
• Operators must wear personal protective equipment.
Summary of Contents for S4 EU-A36
Page 1: ...1 52 User Manual Home Energy Storage System Soluna S4 EU A36 Oct 2020 Revision A 1 ...
Page 18: ...18 52 Figure 2 5 Appearance Number Name Remark Door lock of system Door Key ...
Page 30: ...30 52 Step7 Electrical connection Figure 3 7 Electrical connection ...
Page 35: ...35 52 PV information Load information Grid information ...