Solax X3 series User Manual Download Page 3

1.1  Scope of Validity

This  manual  is  an  integral  part  of  X3  Series,  It  describes  the  assembly, 
installation, commissioning, maintenance and failure of the product. Please 
read it carefully before operating.

 

    

Note:  

“8.0”

 means 8.0kW. 

”T” 

means “dual”  MPPT strings. 

MPPT. 

“D” 

means with “DC Switch”, 

”N”

 means without “DC Switch”. 

“P” 

means MIC PRO series.

Keep this manual at where is accessible all the time.

1.2  Target Group

This  manual  is  for  qualified  electricians. The  tasks  described  in  this  manual 
only can be performed by qualified electricians.

1.3 Symbols Used

The following types of safety instructions and general information appear in 
this document as described below:

              
               

 Danger

         

          “Danger” indicates a hazardous situation which, if not avoided,      

                        will result in death or serious injury.

                  

Warning

             

     “Warning” indicates a hazardous situation which, if not

                        avoided,  could result in death or serious injury.

         
                

Caution

            

   

   “Caution” indicates a hazardous situation which, if not 

                        avoided,  could result in minor or moderate injury.

              

                  

                       Note

             

            “Note” provides tips that are valuable for the optimal

                          operation of  your product

.

1 Notes on this Manual

7  Troubleshooting

   7.1    Trouble Shooting
   7.2    Routine Maintenance   

8  

Decommissioning

   8.1    Dismantling the Inverter
   8.2    Packaging
   8.3    Storage and Transportation
  

 

 

  

 

Notes on this Manual

Contents

03

02

  

 40

    40
    43

  44

   44
   44
   44
   

 

 

  

 

X3-8.0P-T-D              X3-8.0P-T-N  
X3-10.0P-T-D           X3-10.0P-T-N 
X3-12.0P-T-D           X3-12.0P-T-N  
X3-15.0P-T-D           X3-15.0P-T-N 

Summary of Contents for X3 series

Page 1: ...ual belongs to Solax Power Network Technology Zhe jiang Co Ltd Any corporation or individual should not plagiarize partially or fully copy including software etc and no reproduction or distribution of...

Page 2: ...ter 3 3 Dimension 4 Technical Data 4 1 DC Input 4 2 AC Output 4 3 Efficiency Safety and Protection 4 4 General Data 5 Installation 5 1 Check for Transport Damage 5 2 Packing List 5 3 Installation Prec...

Page 3: ...rmation appear in this document as described below Danger Danger indicates a hazardous situation which if not avoided will result in death or serious injury Warning Warning indicates a hazardous situa...

Page 4: ...nd of the DC cabling and at the array located between the inverter and the PV generator if the voltage protection level VP of the surge arresters is greater than 1100V an additional SPD type 3 require...

Page 5: ...tion and that wire is not undersized Do not disassemble any parts of inverter which are not mentioned in installation guide It contains no user serviceable parts See Warranty for instructions on obtai...

Page 6: ...all comply with the requirements of BS 7671 Electrical installation of PV system shall comply with requirements of BS 7671 and IEC 60364 7 712 No protection settings can be altered User shall ensure t...

Page 7: ...configuring system correctly including using the specified wires The system must be installed only by professional assemblers who are familiar with requirements for safety and EMC The assembler is re...

Page 8: ...t power factor Feed in phase 8000 8800 11 6 12 8 Object A DC Switch optional Pocket WiFi Lan GPRS all optional DRM Smart plug optional AC Connector B C D E F G H I J Description Waterproof plug RS 485...

Page 9: ...w MAINS PV Forced air ow 45dB WIFI optional Lan optional GPRS optional Meter optional USB DRM RS485 5 10 optional 5 Installation 5 1 Check for Transport Damage 5 2 Packing List Make sure the inverter...

Page 10: ...cket on the wall Step 2 Match the inverter with wall bracket Below tools are needed before installation Installation tools crimping pliers for binding post and RJ 45 screwdriver stripping pliers wire...

Page 11: ...N X3 15 0P T N is purchased X3 8 0P T N X3 8 0P T D X3 10 0P T N X3 10 0P T D X3 12 0P T N X3 12 0P T D X3 15 0P T N X3 15 0P T D Danger Danger to life due to high voltage on DC conductors when expose...

Page 12: ...8mm The parameters have some differences because of different environment and material Please according to the local conditions to choose appropriate cable and micro breaker X3 8 0P T N X3 8 0P T D X3...

Page 13: ...d in the end use system connectors cables junction box switch ger etc and the reverse current PV modules shall be considered based on the feedback current and reverse current The direct current DC cir...

Page 14: ...onal three phase meter Load X3 series inverter 1 Prepare RJ45 connector and a communication cable 2 Trip the insulation from the communication cable 3 Let the communication cable pass though the water...

Page 15: ...DSP 618 00103 00_MIC_DSP_Vx xx_xxxxxxxx hex Upgrade Steps Update ARM DSP 3 then insert U disk into the USB port on the bottom of the inverter Then turn on DC switch or connect the PV connector the LCD...

Page 16: ...time to start up Above steps are for the regular start of the inverter If it is the first time to start up the inverter you need to setup the inverter 6 Operation Method 6 1 Control panel Below is the...

Page 17: ...nterface User can select interface by moving the cursor with function button and press OK to confirm Status The status function contains three aspects of the inverter grid solar and load Press up and...

Page 18: ...y country VDE4105 Load L1 Power 0W Setting If inputting the installer password the information of the LCD interface is as below a Safety The user can set the safety standard here According to differen...

Page 19: ...r down button Press OK to confirm and alternate to next word After word is confirmed press OK to reset the password New Password 1 2 3 4 34 35 Operation Method Operation Method e RF Control RF Control...

Page 20: ...ive standard curve cos f P For VDE ARN 4105 curve cos f P should refer to curve A default values of setting are as shown in curve A For E 8001 curve cos f P should refer to curve B default values of s...

Page 21: ...nd press OK to confirm the selection press ESC to return to Menu a Inverter Yield The inverter yield function contains energy generated by today yesterday this month last month and total Press up and...

Page 22: ...nnect them Or seek help form us if can not go back to normal state PV connection setting fault Disconnect PV and PV reconnect them Or seek help form us if can not go back to normal state EEPROM readin...

Page 23: ...n shall examine and maintain the machine regularly The concrete operations are follow 1 Check that if the cooling fins on the rear of house are covered by dirts and the machine should be cleaned and a...

Page 24: ...owing requirements Suitable for loads more than 30 kg With handle Can be fully closed 8 3 Storage and Transportation Store the inverter in dry place where ambient temperatures are always between 25 C...

Reviews: