Solax X3 series User Manual Download Page 11

5.5 Connection of the Inverter

PV String Connection

Ø

X3 series inverter have three couples PV connectors which can be connected in 
series  into 3-strings PV modules. Please select PV modules with excellent function 
and reliable quality. Open circuit voltage of module array connected should be 

Max.DC (table as follow) input voltage, and operating voltage should be within 
the MPPT voltage range. 

c)

d)

Table 3   Max. DC  Voltage Limitation

Max.DC Voltage

1000V

Warning!

PV module voltage is very high which belongs to dangerous 
voltage range, please comply with the electric safety rules when 
connecting.

Warning!

Please do not make PV positive or negative ground!

Note!

Please follow the requirements of PV modules as below:
Same type; Same quantity; Identical alignment; Identical tilt.
In order to save cable and reduce the DC loss, we suggest 
installing the inverter near PV modules.

5.5.1  The Main Steps to Connect to the Inverter

IBMU

18

Installation 

Installation 

Model

Note!

Please choose a suitable external DC switch if the model (X3

-

8

.

0P

-

T

-

N

,

X3

-

10

.

0P

-

T

-

N

,

X3

-

12

.

0P

-

T

-

N

,

X3

-

15

.

0P

-

T

-

N) is purchased.

X3-8.0P-T-N

X3-8.0P-T-D

X3-10.0P-T-N

X3-10.0P-T-D

X3-12.0P-T-N

X3-12.0P-T-D

X3-15.0P-T-N

X3-15.0P-T-D

Danger!

Danger to life due to high voltage on DC conductors.
when exposed to sunlight,the pv array generates dangerous DC 
voltage which is present in the DC conductors.Touching the DC 
conductors can lead to lethal electric shocks.
Cover the PV modules.        Do not touch the DC conductors.

19

Connection Steps

Below tools are needed before connection.

Strpping pliers

Wire crimper

Wire crimper recommended model :
H4TC0001  
manufacturer:Amphenol

7.0 mm

12AWG

trip length

d) Crimp pin contact by using the wire crimper.

c)  Insert striped wire into pin contact and ensure all conductor strand are captured 
     in the pin contact.

f ) Insert the wire into plug forcibly, when a "click” is heard or felt the pin contact 
     assembly is seated correctly. Then tighten the cable nut. 

pin contact

Crimp these parts

e) Separate the DC connector as two parts: the plug and the cable nut.
     Then insert the wire with pin contact through the cable nut.

Wire crimper

plug

cable nut

a)  Turn off the DC switch, then Choose 12 AWG wire to connect the PV module.

b)  Trip 7mm of insulation from the wire end by using the strpping pliers.

( recommended model: H4TC0001, manufacturer: Amphenol)

Summary of Contents for X3 series

Page 1: ...ual belongs to Solax Power Network Technology Zhe jiang Co Ltd Any corporation or individual should not plagiarize partially or fully copy including software etc and no reproduction or distribution of...

Page 2: ...ter 3 3 Dimension 4 Technical Data 4 1 DC Input 4 2 AC Output 4 3 Efficiency Safety and Protection 4 4 General Data 5 Installation 5 1 Check for Transport Damage 5 2 Packing List 5 3 Installation Prec...

Page 3: ...rmation appear in this document as described below Danger Danger indicates a hazardous situation which if not avoided will result in death or serious injury Warning Warning indicates a hazardous situa...

Page 4: ...nd of the DC cabling and at the array located between the inverter and the PV generator if the voltage protection level VP of the surge arresters is greater than 1100V an additional SPD type 3 require...

Page 5: ...tion and that wire is not undersized Do not disassemble any parts of inverter which are not mentioned in installation guide It contains no user serviceable parts See Warranty for instructions on obtai...

Page 6: ...all comply with the requirements of BS 7671 Electrical installation of PV system shall comply with requirements of BS 7671 and IEC 60364 7 712 No protection settings can be altered User shall ensure t...

Page 7: ...configuring system correctly including using the specified wires The system must be installed only by professional assemblers who are familiar with requirements for safety and EMC The assembler is re...

Page 8: ...t power factor Feed in phase 8000 8800 11 6 12 8 Object A DC Switch optional Pocket WiFi Lan GPRS all optional DRM Smart plug optional AC Connector B C D E F G H I J Description Waterproof plug RS 485...

Page 9: ...w MAINS PV Forced air ow 45dB WIFI optional Lan optional GPRS optional Meter optional USB DRM RS485 5 10 optional 5 Installation 5 1 Check for Transport Damage 5 2 Packing List Make sure the inverter...

Page 10: ...cket on the wall Step 2 Match the inverter with wall bracket Below tools are needed before installation Installation tools crimping pliers for binding post and RJ 45 screwdriver stripping pliers wire...

Page 11: ...N X3 15 0P T N is purchased X3 8 0P T N X3 8 0P T D X3 10 0P T N X3 10 0P T D X3 12 0P T N X3 12 0P T D X3 15 0P T N X3 15 0P T D Danger Danger to life due to high voltage on DC conductors when expose...

Page 12: ...8mm The parameters have some differences because of different environment and material Please according to the local conditions to choose appropriate cable and micro breaker X3 8 0P T N X3 8 0P T D X3...

Page 13: ...d in the end use system connectors cables junction box switch ger etc and the reverse current PV modules shall be considered based on the feedback current and reverse current The direct current DC cir...

Page 14: ...onal three phase meter Load X3 series inverter 1 Prepare RJ45 connector and a communication cable 2 Trip the insulation from the communication cable 3 Let the communication cable pass though the water...

Page 15: ...DSP 618 00103 00_MIC_DSP_Vx xx_xxxxxxxx hex Upgrade Steps Update ARM DSP 3 then insert U disk into the USB port on the bottom of the inverter Then turn on DC switch or connect the PV connector the LCD...

Page 16: ...time to start up Above steps are for the regular start of the inverter If it is the first time to start up the inverter you need to setup the inverter 6 Operation Method 6 1 Control panel Below is the...

Page 17: ...nterface User can select interface by moving the cursor with function button and press OK to confirm Status The status function contains three aspects of the inverter grid solar and load Press up and...

Page 18: ...y country VDE4105 Load L1 Power 0W Setting If inputting the installer password the information of the LCD interface is as below a Safety The user can set the safety standard here According to differen...

Page 19: ...r down button Press OK to confirm and alternate to next word After word is confirmed press OK to reset the password New Password 1 2 3 4 34 35 Operation Method Operation Method e RF Control RF Control...

Page 20: ...ive standard curve cos f P For VDE ARN 4105 curve cos f P should refer to curve A default values of setting are as shown in curve A For E 8001 curve cos f P should refer to curve B default values of s...

Page 21: ...nd press OK to confirm the selection press ESC to return to Menu a Inverter Yield The inverter yield function contains energy generated by today yesterday this month last month and total Press up and...

Page 22: ...nnect them Or seek help form us if can not go back to normal state PV connection setting fault Disconnect PV and PV reconnect them Or seek help form us if can not go back to normal state EEPROM readin...

Page 23: ...n shall examine and maintain the machine regularly The concrete operations are follow 1 Check that if the cooling fins on the rear of house are covered by dirts and the machine should be cleaned and a...

Page 24: ...owing requirements Suitable for loads more than 30 kg With handle Can be fully closed 8 3 Storage and Transportation Store the inverter in dry place where ambient temperatures are always between 25 C...

Reviews: