Main cable(AC line cable)shall be short circuit protected and thermal overload 
protected.
Always fit the input cable with fuse. Normal gG(US:CC or T)fuses will protect the 
input cable in short circuit situation. They will also prevent damage to adjoining 
equipment.
Dimension the fuses according to local safety regulations, appropriate input 
voltage and the related current of the solar inverter.

The rated short circuit breaking capacity of the above protective device shall be 
at least equal to the prospective fault current at the point of installation. See 
section technical data of this manual details.

2

2

AC output cable: Cu; R,S,T, N+PE: 3*5.0mm +5.0mm  for 8.0KW and 

2

2

2*6.0mm +6.0mm  for 10.0KW/12.0KW/15.0KW @40

 ambient temperature 

with a max length of 5m, with operating time of the fuses is less than 5 seconds, 
installation method B2 according to EN60204-1:2006, annex D: cable in conduit 
cable trunking system, number of loaded circuit only one. Use H07RNF(cord 
designation 60245 IEC66) for an ambient temperature of 40

 or less and use 

90

 wire for ambient temperature between 40

 and 60

.

Note 1

: For condition differing form those mentioned above, dimension the 

cables according to local safety regulations, appropriate input voltage and the 
load and the load current of the unit.(You can choose a thicker cable but the 
fuses must rated according to the cable.)

Note 2

: Fuses must be approved by Notified Body.

Therefore the current-carrying capacity of the components and sub-assemblies 
provided in the end-use system(connectors, cables, junction box, switch ger, etc.) 
and the reverse current PV modules shall be considered based on the feedback 
current and reverse current. The direct current(DC) circuit breaker or fuse 
between each solar generator and inverter shall be provided based on solar 
inverter input ratings.
Select DC cables based in the above inverter back-feed current and ISC PV rating 
and Vmax ratings.

Selection of Fuses and Cables 

Earth Connection

Ø

Screw

(

φ

4

 the ground screw with screwdriver shown as follow. 

hexagon wrench.torque:1.5

±

0

.

2Nm)

5.5.2  Communication interface

This product has a series of communication interfaces: such as 
WIFI/LAN/GPRS, RF, RS485/Meter, DRM and USB for upgrading for human 
and machine communication. Operating information like output voltage, 
current, frequency, faulty information, etc., can be delivered to PC or 
other monitoring equipment via these interfaces.

WiFi/Lan

 

/GPRS(Optional)

This inverter provides a WiFi/Lan port which can collect information from 
inverter including status, performance and updating information to 
monitoring website via connecting Pocket WiFi/Pocket Lan( purchase the 
product from supplier if needed)

Connection steps:

Please check the Pocket WiFi user manual for more details.(torque:0.6

±

0

.

1Nm)

22

23

Installation 

Installation 

RF(Optional)

The inverter provides a RF(radio frequency) interface which can make a 
load be switched or operated in a specified duration via connecting an 
external Smart plug(purchase the product from supplier if needed.) so that 
the load mostly consumes PV energy and incurs the lowest-possible 
energy costs during operation.
Please check the Smart Plug user manual for the detail of connection steps.

Summary of Contents for X3 series

Page 1: ...ual belongs to Solax Power Network Technology Zhe jiang Co Ltd Any corporation or individual should not plagiarize partially or fully copy including software etc and no reproduction or distribution of...

Page 2: ...ter 3 3 Dimension 4 Technical Data 4 1 DC Input 4 2 AC Output 4 3 Efficiency Safety and Protection 4 4 General Data 5 Installation 5 1 Check for Transport Damage 5 2 Packing List 5 3 Installation Prec...

Page 3: ...rmation appear in this document as described below Danger Danger indicates a hazardous situation which if not avoided will result in death or serious injury Warning Warning indicates a hazardous situa...

Page 4: ...nd of the DC cabling and at the array located between the inverter and the PV generator if the voltage protection level VP of the surge arresters is greater than 1100V an additional SPD type 3 require...

Page 5: ...tion and that wire is not undersized Do not disassemble any parts of inverter which are not mentioned in installation guide It contains no user serviceable parts See Warranty for instructions on obtai...

Page 6: ...all comply with the requirements of BS 7671 Electrical installation of PV system shall comply with requirements of BS 7671 and IEC 60364 7 712 No protection settings can be altered User shall ensure t...

Page 7: ...configuring system correctly including using the specified wires The system must be installed only by professional assemblers who are familiar with requirements for safety and EMC The assembler is re...

Page 8: ...t power factor Feed in phase 8000 8800 11 6 12 8 Object A DC Switch optional Pocket WiFi Lan GPRS all optional DRM Smart plug optional AC Connector B C D E F G H I J Description Waterproof plug RS 485...

Page 9: ...w MAINS PV Forced air ow 45dB WIFI optional Lan optional GPRS optional Meter optional USB DRM RS485 5 10 optional 5 Installation 5 1 Check for Transport Damage 5 2 Packing List Make sure the inverter...

Page 10: ...cket on the wall Step 2 Match the inverter with wall bracket Below tools are needed before installation Installation tools crimping pliers for binding post and RJ 45 screwdriver stripping pliers wire...

Page 11: ...N X3 15 0P T N is purchased X3 8 0P T N X3 8 0P T D X3 10 0P T N X3 10 0P T D X3 12 0P T N X3 12 0P T D X3 15 0P T N X3 15 0P T D Danger Danger to life due to high voltage on DC conductors when expose...

Page 12: ...8mm The parameters have some differences because of different environment and material Please according to the local conditions to choose appropriate cable and micro breaker X3 8 0P T N X3 8 0P T D X3...

Page 13: ...d in the end use system connectors cables junction box switch ger etc and the reverse current PV modules shall be considered based on the feedback current and reverse current The direct current DC cir...

Page 14: ...onal three phase meter Load X3 series inverter 1 Prepare RJ45 connector and a communication cable 2 Trip the insulation from the communication cable 3 Let the communication cable pass though the water...

Page 15: ...DSP 618 00103 00_MIC_DSP_Vx xx_xxxxxxxx hex Upgrade Steps Update ARM DSP 3 then insert U disk into the USB port on the bottom of the inverter Then turn on DC switch or connect the PV connector the LCD...

Page 16: ...time to start up Above steps are for the regular start of the inverter If it is the first time to start up the inverter you need to setup the inverter 6 Operation Method 6 1 Control panel Below is the...

Page 17: ...nterface User can select interface by moving the cursor with function button and press OK to confirm Status The status function contains three aspects of the inverter grid solar and load Press up and...

Page 18: ...y country VDE4105 Load L1 Power 0W Setting If inputting the installer password the information of the LCD interface is as below a Safety The user can set the safety standard here According to differen...

Page 19: ...r down button Press OK to confirm and alternate to next word After word is confirmed press OK to reset the password New Password 1 2 3 4 34 35 Operation Method Operation Method e RF Control RF Control...

Page 20: ...ive standard curve cos f P For VDE ARN 4105 curve cos f P should refer to curve A default values of setting are as shown in curve A For E 8001 curve cos f P should refer to curve B default values of s...

Page 21: ...nd press OK to confirm the selection press ESC to return to Menu a Inverter Yield The inverter yield function contains energy generated by today yesterday this month last month and total Press up and...

Page 22: ...nnect them Or seek help form us if can not go back to normal state PV connection setting fault Disconnect PV and PV reconnect them Or seek help form us if can not go back to normal state EEPROM readin...

Page 23: ...n shall examine and maintain the machine regularly The concrete operations are follow 1 Check that if the cooling fins on the rear of house are covered by dirts and the machine should be cleaned and a...

Page 24: ...owing requirements Suitable for loads more than 30 kg With handle Can be fully closed 8 3 Storage and Transportation Store the inverter in dry place where ambient temperatures are always between 25 C...

Reviews: