5.3 Installation Precaution
Please avoide direct sunlight, rain exposure, snow laying up during installing and
operating.
X3-PRO G2 Series inverter is designed for outdoor installation (IP66).
Make sure the installation site meets the following conditions:
Not in direct sunlight.
Not in areas where highly flammable materials are stored.
Not in potential explosive areas.
Not near the television antenna or antenna cable.
Not higher than altitude of about 4000 m above sea level.
Not in environment of precipitation or humidity.
Be sure the ventilation is good enough.
The ambient temperature in the range of -30
℃
to +60
℃
.
The slope of the wall should be within
±
5
°
.
5.4 Installation Steps
Preparation
Ø
Below tools are needed before installation.
Installation
Installation
The wall hanging the inverter should meet conditions below:
1. solid brick/concrete, or strength equivalent mounting surface;
2. Inverter must be supported or strengthened if the wall’s strength isn’t
enough(such as wooden wall, the wall covered by thick layer of decoration)
Type
M
achine I
nstallation
Tools
Tool equipment
Bit
Φ
10
Name
Image
Hammer
drill
Outer
hexagonal
wrench
Torque
screwdriver
Name
Image
Utility knife
Diagonal
pliers
Multifunction
termina
l
crimping
tool (RJ45)
Multimeter
Marker
Tape
measure
Protective
glasses
Safety
gloves
Individual
Protection
Tools
Rubber
hammer
OT
terminal
press clamp
0.5mm
²
~
10
mm
²
Wrench
Screwdrivers
Inner
h
exagon
al
wren
c
h
Crimping
Too
l
Crosshead M5
DC Voltage
Range ≥1100 VDC
Wire
stripper
18
19