If you do not report the mapping of the installed Power Optimisers, the monitoring
platform will show the logical layout indicating which Power Optimisers are connected
to which , but will not show strings or the physical location of Power Optimisers.
The monitoring platform includes a built-in help system that guides you
through the monitoring functionality.
For more information, refer to
https://www.solaredge.com/products/pv-
.
Creating Logical and Physical Layout using
Installation Information
To display a logical layout, insert in the new site created in the monitoring platform.
When the communication between the and the monitoring server is established, the
logical layout is displayed.
To display a physical layout, you need to map the locations of the installed power
optimisers. To map the locations, use one of the methods described in the next sections.
Designer
Designer recommends inverter and Power Optimiser selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the string layout to the monitoring platform.
For more information, refer to
https://www.solaredge.com/products/installer-tools/designer#/
Physical Layout Editor
1. If you are a registered installer, access the monitoring platform site
https://monitoring.solaredge.com/solaredge-
. If you have not yet signed up, go to
https://monitoring.solaredge.com/solaredge-
2. Fill out all required information in the screen, which includes
information about your installation, as well as details about its logical
and physical mapping.
Chapter 6: Activating, Commissioning and Configuring the System
52
Three Phase Inverter with SetApp Configuration