For troubleshooting Power Optimiser operation problems, refer to
Proper Power Optimiser connection can also be verified in the Designer application.
For more information, refer to
https://www.solaredge.com/products/installer-tools/designer#/
Step 5: Connecting the Strings to a
Combiner Box
For connecting the strings to the DC Safety Unit with glands using a single input
connection use a combiner box. The combiner box should reside between the modules
and the inverter.
Three Phase Inverter with SetApp Configuration
19
Step 5: Connecting the Strings to a Combiner Box
Summary of Contents for SE15K-AU
Page 64: ......