June 2020
|
Solar Stik
®
, Inc.
6
|
SYSTEM SETUP AND OPERATION GUDIE FOR THE 1 kW HYBRID POWER SYSTEM (HPS)
PRELIMINARY DRAFT
List of Tables
Table 1. User Interface LED Indicators ........................................................................................................................... 44
Table 2. Operating Modes: Descriptions ........................................................................................................................ 45
Table 3. Programmable Parameter Groups: Descriptions .............................................................................................. 48
Table 4. Parameters for Battery Charging/Battery Protection ........................................................................................ 49
Table 5. Parameters for Grid/Generator Input Current Level, Frequency Range ........................................................... 50
Table 6. Parameters for Grid/Generator Input Low Voltage Level .................................................................................. 51
Table 7. Parameters for Grid/Generator Input High Voltage Level ................................................................................. 51
Table 8. Power Saving/Alarm/Remote Switch/Multi-function Relay/etc. ....................................................................... 52
Table 9. Local Time Clock Setting .................................................................................................................................. 52
Table 10. Instructions to Remove SD Card from PRO-Verter User Interface ................................................................. 52
Table 11. Fault Messages Symptoms and Troubleshooting ........................................................................................... 62
Table 12. 24VDC PRO-Verter S 2000-120 PMCS........................................................................................................... 66
Table 13. In-storage Preventive Maintenance Checks and Services ............................................................................. 68
Table 14. PV Array PMCS ............................................................................................................................................... 69
Revision History
Section
Page(s) Description
Date
First released as a PRELIMINARY DRAFT
June 2020