June 2020
|
Solar Stik
®
, Inc.
58
|
SYSTEM SETUP AND OPERATION GUDIE FOR THE 1 kW HYBRID POWER SYSTEM (HPS)
PRELIMINARY DRAFT
PV only
This scenario demonstrates System performance at various continuous loads having only the 300 W
PV array as a power source and assuming five (5) hours of sun daily. In this scenario, the System will
run indefinitely (
∞
) when supporting loads loads of less than ~63 W.
Load (W)
Hours of Runtime
Figure 28. System runtime at various loads with PV power only
21.7
14.5
10.9
8.7
7.2
6.2
5.4
4.8
4.3
0
4
8
12
16
20
24
50 W
100 W
150 W
200 W
250 W
300 W
350 W
400 W
450 W
500 W
Hour
s of Runtime
Load
∞