
OPERATION OF THE DEVICE
HYD 5K...20KTL-3PH
105
In situations where the customer
only wants to support the local
loads or has a zero-export limit
across all three phases. When used
in conjunction with the supplied
three-phase energy meter and with
this option set to "enable", the per
phase output current of the inverter
will respond independently.
Important: for this function to
operate properly, the phase on the
energy meter must correlate to the
corresponding phase when it is
wired into the inverter.
Password
Several settings require a password to be entered (the standard
password is 0001).
Energy Statistics menu
Today
Press Down button to move
between items
Shows PV, Load, Export, Import, Charge,
Discharge Energy (kWh) for the selected
period
Month
Year
Lifetime
System Information menu
1. Inverter Info