OPERATION OF THE DEVICE
104
HYD 5K...20KTL-3PH
Parallel Master/Slave
One Inverter need to be set as
Master (Primary), all other inverters
need to be set to Slave (Replica)
Parallel Address
Set each inverter with an individual
parallel address. (It is an
independent number from Modbus
ID)
Save
After changes, select “save” item to
save the settings
8. Bluetooth Reset
Resets the Bluetooth interface of
the inverter
9. CT Calibration
This function is used to correct the
direction and grid phase
assignment of the connected CTs.
During CT Calibration, the inverter
must be connected to a battery and
the grid.
It is recommended to turn off the
load during calibration.
If calibration fails, check if the
battery can be charged/discharged
correctly
10. Switch On / Off
The inverter can be switched on,
switched off, set to standby or set
to normal operating mode, which
can be useful for installation or
maintenance work
11. Unbalanced Support
Default setting: disabled