5.Commissioning of
inverter
Outline this Chapter
Introduce SOFAR 3.3~12KTLX-G3 safety inspection and start processing
5.1. Cable Connection Inspection
For first time operation, check the AC voltage and DC voltage
are within the acceptable range
Attention
AC grid connection
Use multimeter to confirm that three lines and PE line are connect correctly. DC
pv connection
Use multimeter to confirm that positive pole and negative pole of PV strings,
and the Voc of each string is lower than the inverter max DC input.
5.2. Start Inverter
Step 1:
Turn ON the DC switch.
Step 2:
Turn ON the AC circuit breaker.
When the DC power generated by the solar array is enough, the SOFAR
3.3~12KTLX-G3 inverter will start automatically. Screen showing “normal”
indicates correct operation.
NOTE 1:
Choose the correct country code. (refer to section 6.3 of this manual)
NOTE 2:
Different distribution network operators in different countries have different requirements
regarding grid connections of PV grid connected inverters.
Therefore, it's very important to make sure that you have selected the correct
country code according to requirements of local authority. Please consult
qualified electrical engineer or personnel from electrical safety authorities about
this.
Shenzhen SOFARSOLAR Co., Ltd. is not responsible for any consequences