62
EN
DIRIS B-10L - 551174A - SOCOMEC
• Measurement
- The uplink period determines the integration period of load curves and trends of average values.
-
Electrical network: configure the electrical network type (three-phase, with or without neutral, etc.), the nominal
voltage and frequency, and the phase rotation.
- Load:
Activate: activate a load and name it.
Type: enter the load type (single-phase, three-phase with or without neutral etc.), and the nominal current.
Phase association to current inputs: indication only, shows the association of RJ12 current inputs to phase
conductors.
-
Current sensors: for each current input (I01 - I04), you can configure the following fields:
Rating: the rating of current sensors is automatically detected
CT way (for current sensors only): positive (P1 - > P2) or negative (P2 -> P1).
Associated voltage: voltage associated to the current measurement.
- Calculations:
Integration periods: enter the integration period of instantaneous values.
THD: you can configure the THD calculation method
Other: you can configure the calculation method for powers and energies (vector or arithmetic) and the power
factor convention.
• Digital I/O
- Digital Input:
Mode: configure the digital input mode.
Binary state & Pulse meter.
Synch.signal (for the native input no 1 of the B-10L only).
Type: normally open or normally closed.
Name: you can name the digital input. The name will be shown on the D-50/D-70 display and on WEBVIEW.
Pulse meter: if the digital input “Mode” is set to “Bin. State & Pulse meter”, you must enable the “Pulse Meter”
function if you want collect pulses from utility meters.
- Digital Output: the digital outputs can be used for alarm reporting purposes.
Type: normally open or normally closed.
Name: you can name the digital output. The name will be shown on the D-50/D-70 display and on WEBVIEW.
• Temperature Inputs
- Temperature input names: name the different temperature inputs. The name will be shown on WEBVIEW.
• Monitoring
- Load Curves
Integration period: the integration period of load curves is displayed (it is equal to the uplink period configured
in the "LoRa" menu).
Metrological LED: choose the energy type and the load associated to the metrological pulse LED on the front
of the DIRIS B-10L.
- Load shedding: It allows to trigger an output command if the predictive power value exceeds a pre-determined
threshold.
State: enable or disable the Load shedding function.
Output: choose the digital output associated to the load shedding function.
Associated predictive power: choose the associated predictive power.
Threshold: enter the threshold from which the load shedding function will be triggered.
- Protection
Protective device: select the protective device type (breaker, fusible switch, switch, fuse.)
Sources: select the source for the position and trip information. When iTR sensors are used, the VirtualMonitor
technology is used.
Thresholds: used to differentiate between no-load, on-load and overload manual openings and trips.