EN – 20
5.
Install traction drive belt onto traction drive pulley.
6.
Install traction drive belt onto traction sheave.
7.
Reinstall support bushing onto swing gate pivot rod.
8.
Reinstall spring clip into pivot rod.
NOTICE:
Support bushing MUST be correctly seated in
and flush with frame.
9.
Reinstall swing gate spacer and align with support
bushing. Secure with two tapping screws.
10. Reconnect idler spring to traction drive idler.
11. Reconnect swing gate return spring to frame.
12. Reinstall housing to frame. See
13. Adjust traction drive clutch. Refer to Operator’s
Manual for adjustment procedure.
14. Reconnect spark plug wire.
IMPORTANT:
Check all adjustments after first use.
Figure 35
Figure 36
1. Support Bushing
2. Swing Gate Spacer
Figure 37