7
“
A
SSEMBLY
I
NSTRUCTIONS
”
S
TEP
7
–
Handlebar Assembly
a. There is an
“R” decal on the
RIGHT HANDLEBAR(10)
and an
“L” decal on the
LEFT HANDLEBAR(9)
.
Slide the
HANDLEBAR SLEEVE(48)
onto the
RIGHT HANDLEBAR(10)
.
b. Attach the
RIGHT HANDLEBAR(10)
into the
RIGHT PIVOTING ARM(12)
with
2 x SOCKET HEAD
BOLTS(M6x35mm)(90)
and
2 x NYLON LOCK NUTS(M6)(102)
.
NOTE:
Assemble the SOCKET HEAD
BOLTS(M6x35mm)(90) by following the direction as shown by the drawing
c. Slide the
HANDLEBAR SLEEVE(48)
down to the cover the bolts on the
RIGHT HANDLEBAR(10)
.
d. Repeat the above step on the left side.
S
TEP
8
–
Mounting Bracket & Water Bottle Assembly
Attach the
MOUNTING BRACKET(61)
onto the
UPRIGHT POST(4)
with
2 x ROUND HEAD
BOLTS(M5x12mm)(86)
. Place the
WATER BOTTLE(62)
into the
MOUNTING BRACKET(61)
.
S
TEP
9
–
Adapter Assembly
Refer to the drawing on the left. Connect the
ADAPTER(77)
to the connector located on
the base of the
MAIN FRAME(1)
. Plug the
ADAPTER(77)
into a 110V electrical outlet.
Finish the assembly, make sure that all parts are fully tightened before using the
equipment.
Summary of Contents for CE-3.0DS
Page 37: ...36 PRODUCT PARTS DRAWING...