Valve for Water and Chemical Base Fluids
VCC
Series
OUT
IN
O-ring for paint seal
Special FKM
Production lot number
Part no.
Place the arrow within
±
15
°
of IN port position.
2 port valve
3 port valve
Model label
G1/4
IN port in valve
OUT
IN
G1/4
RETURN
G1/4
O-ring for air
HNBR
IN port in valve
ON
OFF
Attach and remove the valve straight. If the paint applied to the O-ring for paint adheres to the pneumatic passage, clean it.
When inserting, apply vaseline to the O-ring and the inner surface of the base and insert slowly so that the O-ring is not twisted or cut.
The arrow shown on the model label of the valve is set for the optimum direction for cleaning. Mount the valve so that the arrow comes to IN port
position.
Apply vaseline (commercially available) on the O-ring surface, and in-
sert straight. (Note the direction shown on the label.)
After mounting the indicator lamp cover, tighten the mounting nut to a
tightening torque of 2.5 to 3.5 N·m of tightening torque.
Procedure
q
Loosen the mounting nut with a tool to remove.
w
Remove the indicator lamp cover.
e
Turn 45 to 90
°
(idle turn) clockwise with a tool (to avoid O-ring
adhesion).
r
Pull out the valve straight.
t
Wipe off residual paint on inner surface of the base with a cleaning
material.
y
Replace the O-ring mounted to the valve.
(O-ring part number: See page 658.)
How to Attach the Valve
q
e
r
Apply vaseline.
How to Remove the Valve
Special tool part no.:
VCC-G-A, VCC-G-B
(Refer to page 654.)
Thread for detaching body
(M16 x 1.5)
19
2021-06-10 14:35
DG018865