![background image](http://html1.mh-extra.com/html/smc-networks/ex12-scm-series/ex12-scm-series_operation-manual_1300549013.webp)
-12-
No.EX##-OMM0008-B
(2) Squeeze firmly on the DWT-A01 Pliers until the lock on the connector clicks into place.
Note
•
Do not pressure-weld the connector cover at the edges.
•
Do not pressure-weld the connector cover at the back of the pressure welding block.
•
Set the connector in the correct orientation.
(3) After attaching the cable, confirm that it is properly pressure-welded.