Riverlea Group Ltd warrant that the cladding used in the manufacture of the Smart Store shed will not rust within 15 years from the 

date of purchase.

 

 

 

Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for 

the benefit of the original purchaser. Riverlea Group Limited will not be liable for any consequential loss or damage, labour, or 

transport charges.

 

 

 

This warranty is conditional on:

 

 

Construction, installation and maintenance being carried out as specified in the Assembly Instruction Manual.

 

 

The shed being installed in modest inland corrosion zones or areas where the steel corrosion rate is less than 200g/m2          
(as published by Branz).

 

 

Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase. 

 

 

 

This warranty does not cover the following:

 

 

Fastenings and fixings.

 

 

Normal wear and tear, damage by impact or acts of God.

 

 

Situations where the shed has been used for storage of chemicals, manure or corrosion causing products.

 

 

Unauthorized modification of the structure, including painting of the cladding.

 

 

Please visit http://www.riverleagroup.co.nz/warranty

-

garden

-

sheds to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team 

will help you to activate the warranty on your garden shed. 

 

 

 

Many thanks, from the Team at Riverlea Group. 

15 YEAR WARRANTY

 

WARRANTY REGISTRATION

 

Summary of Contents for SS2010

Page 1: ...ASSEMBLY INSTRUCTIONS SS2010 BASE SIZE 2 020m x 1 020m...

Page 2: ......

Page 3: ...r cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as s...

Page 4: ...e Flashing 2 050m 1 Door 3 4 Sheet 1 810 m 2 Barge 1 110 m 2 TIMBER Padbolt Support 0 140 m 1 Bottom Plates H4 Green Front Back 2 020 m 2 Spouting 2 050 m 1 Bottom Plates H4 Green Sides 1 020 m 2 HARD...

Page 5: ...late Side Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Sheets Door Side Flashing Padbolt Support Hinge Door Brace Door Top Bottom Channel QUICK OVERVIEW 1 LAY FOUNDATION 2 ASSEM...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto b...

Page 8: ...then nail along the wall sheet to the Top Plate two clouts per pan see fig 1 STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring each side of wall sheets overhangs the end of Bottom...

Page 9: ...e wall sheets overhang the Top Plate by 15mm as shown Check that the Top Plate is straight then nail wall sheets to the Top Plate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Pla...

Page 10: ...the Door Jamb Flashing Ensure the door closes properly then fit remaining rivets STEP 3 Place 2 x Wall Sheets on timber Ensure that the top of the sheets are flush with the top of the Top Plate and t...

Page 11: ...panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 75mm screws screw the Top Plates together Using 4 x 40mm screws screw the Bot tom Pla...

Page 12: ...ts on both sides The Clear Roof Panel must be secured to the front and back Top Plates Pre drill and fasten with the 40mm weatherseal nails provided SELECT 4 x 1 110 Roof Sheets 1 x 2 050 Spouting 2 x...

Page 13: ...x to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two...

Page 14: ......

Page 15: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: