47
11
How to Start Up UPS Safely After Repairing or Replacing Main Board
When the PCBA board is reinstalled after repairing or replacing a new one, it is more secure for UPS that input
source, no matter DC source or AC source, has some protection function such as current limitation or power
limitation in case the board is damaged again if it still has some potential defects. Here, to lower this risk, we
suggested you use our DC source,which has power limitation function, to simulate DC source to start UPS, if
everything is fine and almost same with the following specific data, then the board repaired or replaced is fine,
otherwise, please recheck it according to some suggestion we provide as below .
11.1 What is the DC Source?
The Smartbitt SBOL series Unit DC Source is made up by two chargers, you can use it as Smartbitt 33
Battery external charger, and it also can use as DC Source to self-test the Smartbitt 33 Unit.
Picture 1: the charger input and out terminal picture
Picture 2: the charger inner picture
Summary of Contents for SBOL50KTIII-3
Page 2: ...2 ...
Page 10: ...10 n 5 Picture of the UPS 30k picture single input dual input ...
Page 11: ...11 30k UPS inner picture 60K picture ...
Page 12: ...12 60K picture 60K unit inner picture ...
Page 13: ...13 Front panel Rear panel Left panel 100K 200K picture ...
Page 14: ...14 Right side panel Top side panel 100K 200K picture ...
Page 38: ...38 HV30KL LV15KL Single Input Mode ...