www.smartdigital.com.au
Edition 1.2
7
6.
Holding the blower to the valve the screen will start to inflate slowly (takes approximately 3
minutes). Once screen has inflated enough to stand up on its own, remove the blower and seal the
first valve. Screen inflates as pictured below when inflated from the “inflation ready” position.
7.
Place the blower back onto the second (top) value and continue inflating until screen frame is firm.
Turn off and remove blower, fastening the final valve cover.