
Section 5
5.1
TECHNICAL CHARACTERISTIC
Functional Specifications
Process Fluid
Liquid, gas or vapor.
Output
Digital only. Complies with IEC 61158-2 (H1): 31.25kbit/s voltage mode, bus powered.
Power Supply
Bus powered: 9 – 32 Vdc.
Quiescent current consumption: 12 mA
Indicator
4 1/2 -digit numerical and 5-character alphanumerical LCD indicator (optional).
Hazardous Area
Certifications
Explosion proof (FM, CSA, NEMKO, CEPEL), intrinsic safe (FM, CSA, NEMKO, EXAM, CEPEL, NEPSI), dust ignition
proof and non-incendive (FM). FISCO Field Device Ex ia IIC T4 (FM, CSA, NEMKO, EXAM, CEPEL, NEPSI) FNICO
Field Device Ex n1 IIC T4 (FM, CSA, NEMKO, EXAM, CEPEL)
European Directive
Information
Authorized representative in European Community
Smar Gmbh-Rheingaustrasse 9-55545 Bad Kreuzanach
PED Directive (97/23/EC) – Pressure Equipment Directive
This product is in compliance with the directive and it was designed and manufactured in accordance with sound
engineering practice using several standards from ANSI, ASTM, DIN and JIS.
EMC Directive (2004/108/EC) - Eletromagnetic Compatibility
The EMC test was performed according to IEC standard: IEC61326-1:2006, IEC61326-2-3:2006, IEC61000-6-4:2006,
IEC61000-6-2:2005. For use in environment only.
Keep the shield insulated at the instrument side, connecting the other one to the ground if necessary to use shielded
cable.
ATEX Directive (94/9/EC) – Equipment and protective systems intended for use in potentially explosive
atmospheres
This product was certified according European Standards at NEMKO and EXAM (old DMT). The certified body for
manufacturing quality assessment is EXAM (number 0158).
LVD Directive 2006/95/EC – Electrical Equipment designed for use within certain voltage limits
According the LVD directive Annex II the equipment under ATEX “Electrical equipment for use in an explosive
atmosphere” directive are excluded from scope from this directive.
The EC declarations of conformity for all applicable European directives for this product can be found at
www.smar.com.
Zero and Span
Adjustments
No interactive, via digital communication.
Failure Alarm
(Diagnostics)
For sensor or circuit failures, status is sent to output parameters. Detailed diagnostics are available in the contained
parameters.
Temperature Limits
Ambient:
Process:
Storage:
Display:
-40
-40
0
-20
-25
-40
-40
-20
-40
to
to
to
to
to
to
to
to
to
85 °C
100 °C
85 °C
85 °C
85 °C
150 °C
100 °C
80 °C
85 °C
(-40
(-40
( 32
( -4
(-13
(-40
(-40
( -4
(-40
to
to
to
to
to
to
to
to
to
185 °F)
212 °F)
185 °F)
185 °F)
185 °F)
302 °F)
212 °F)
176 °F)
185 °F)
(Silicone oil)
(Halocarbon and Fluorolube oil)
(Krytox oil and Fomblim oil)
(Viton O-ring)
(
LD303L
)
(Without damage)
Turn-on Time
Performs within specifications in less than 10 seconds after power is applied to the transmitter.
Configuration
Basic configuration may be done using the local adjustment magnetic tool if device is fitted with display. Complete
configuration is possible using configuration tools.
Volumetric
Displacement
Less than 0.15 cm
3
(0.01 in
3
)
Overpressure and
Static Pressure
Limits (MWP –
Maximum Working
Pressure)
From 3.45 kPa abs. (0.5 psia)* to:
5 bar (70 psi) for range 0
80 bar (1200 psi) for range 1
160 bar (2300 psi) for ranges 2, 3 & 4
320 bar (4600 psi) for models H2 to H4
400 bar (5800 psi) for range 5
520 bar (7500 psi) for range 6
Flange Test Pressure: 60 MPa (8570 psi)
For ANSI/DIN Level flanges (LD303L models):
150lb: 6 psia to 230 psi (-0.6 to 16 bar) at 38 °C (100.8 ºF)
300lb: 6 psia to 600 psi (-0.6 to 41 bar) at 38 °C (100.8 ºF)
600lb: 6 psia to 1200 psi (-0.6 to 83 bar) at 38 °C (100.8 ºF)
PN10/16: - 60 kPa to 1.4 MPa at 120 °C (248 °F)
PN25/40: - 60 kPa to 4 MPa at 120 °C (248 °F)
The above pressures will not damage the transmitter, but a new calibration may be necessary.
Summary of Contents for LD303
Page 1: ...Profibus PA Pressure Transmitter L D 3 0 3 M E...
Page 8: ...LD303 Operation and Maintenance Instruction Manual VIII...
Page 22: ...LD303 Operation and Maintenance Instruction Manual 1 14...
Page 26: ...LD303 Operation and Maintenance Instruction Manual 2 4...
Page 74: ...LD303 Operation and Maintenance Instruction Manual 4 6 Figure 4 4 Exploded View...
Page 83: ...Maintenance Procedures 4 15 Figure 4 8 TPE Software Screen...
Page 102: ...LD303 Certifications Information A 4 CSA NEMKO and EXAM CEPEL NEPSI...
Page 104: ...LD303 Certifications Information A 6 CEPEL...
Page 105: ...Appendix A A 7 Control Drawing Factory Mutual FM...
Page 106: ...LD303 Certifications Information A 8...
Page 108: ...LD303 Operation and Maintenance Instruction Manual B 2...