35
31
39
28
38
33
37
34
25. Push the Upright Ground Stake (31) into ground.
Make sure the Volley Ball Net (33) is tight.
26. Attach the Upright Ground Stake (31) to Lower
Upright Pole (35) with two M8 x45mm Bolts (28),
two M8 Washer with Arc (38) and two M8 LockNuts (39).
27. Tie the ends of the Guide Line (37) cords to the
Upper Upright Pole (34) and pull away to secure the
Upright Pole.
25-26
27
29
28. On the opposite end of the Guide Line(37), you will
thread the line through the eyelet in the Ground Stake
(36).
Take the Tensioning Device with four holes (29) and
thread the line though the three grouped holes. Starting
from the outside, thread into one hole, out the
opposite direction and into the next hole. When exiting
the third hole, place the line through the eyelet on the
Ground Stake (36) and then through the fourth hole
and tie a knot to secure. Place Ground Stake (36) into
the ground and pull the line out away from the
Tensioning Device (29) into a large loop to tighten the
guide line (37). Move the Tensioning Device (29) up the
Guide Line (37) by making large loops pulling the slack
out of the loops with the lower end of the Guide Line (37).
36
29
37
28